Redring Active 350S Скачать руководство пользователя страница 8

 

7.

 

If you have not yet done so, remove the front cover assembly by undoing the retaining screws at 
the top and bottom of the unit and lifting the cover off.                             

 

Your shower is provided with 2 fixing positions in the backplate (see diagram 4).                                         

The top-fixing hole is a “key-hole” slot (another key-hole is provided for alternate fixing), and 
should be marked and drilled first.  

 

Tighten top screw with head protruding about 10mm from the wall and hook the backplate over 
the screw head. This allows for correct and accurate alignment of your shower before marking 

and fixing the bottom position.  

 

You may not wish to tighten up both screws at this stage as the holes are elongated to allow for 
adjustment after other connections have taken place.  

 

b.

 

PLUMBING 

 

WARNING: ENSURE THAT THE MAINS WATER SUPPLY MEETS THE REQUIREMENTS 

BELOW BEFORE CONTINUING WITH INSTALLATION. 

 
The heater must be connected to the mains cold water supply. 

This must have a minimum running pressure of 69kPa (0.7 bar, 10 psi) 
and a maximum pressure of 690kPa (7.0 bar, 100 psi). 

 

WARNING: BEFORE CONNECTING THE PIPE WORK TO THE SHOWER,                                     

ENSURE THAT THE PIPE WORK IS FULLY FLUSHED OUT. 

 

1.

 

Unscrew the “Red Cap” and “Washer” from the shower outlet pipe and discard them in a suitable 
manner. These have been used to seal the shower during transit, and are no longer required. 

 

2.

 

It is recommended that a WRAS (Water Regulations Advisory Scheme) listed isolating valve is 
fitted between the rising main and the unit.                                                                                                                                                          

This will allow the unit to be serviced or exchanged without having to turn off the water at the 
water stop valve. 

 

3.

 

The heater can be fed from a header tank provided this has a minimum head of 7 metres (23ft). 

 

4.

 

Ø15mm copper or stainless steel pipe should be used.                                                                                               

To avoid cross threading, DO NOT REMOVE the nut from the elbow when positioning the pipe.                                                              
If top entry is required, turn the elbow 180° into the required position.                                                                                 
If rear entry is required, treat as top entry with an additional “Yorkshire” elbow (soldered type) 

for fitting into the rear channel.                                                                                                                                                                                      
In multiple installations, correct pipe work sizes should be calculated to maintain adequate flow 
to each shower. 

 

5.

 

It is in order to use a WRAS (Water Regulations Advisory Scheme) approved sealant sparingly 
whilst avoiding excess finding its way into the shower operating parts. 

 

6.

 

With stop valve connected, 

flush the pipe work through to remove any particles etc

before making the final connection to the shower.                                                                                                                                                     
Blockage in the water ways (particularly the handset and solenoid valve) will prevent the heater 
working properly. 

 

7.

 

The shower is designed to have an open outlet and should only be used with ”Redring” 
recommended fittings.                                                                                                                         

Do not connect the handset until after the shower front cover and corner section are fitted. 

 

WARNING: DO NOT FIT A TAP ON THE SHOWER OUTLET.  

 

WARNING: TAKE CARE TO AVOID RESTRICTING THE OUTLET OF THE                                   

PRESSURE RELIEF DEVICE 

Содержание Active 350S

Страница 1: ...IMPORTANT This booklet should be left with the user after installation and demonstration REDRING ACTIVE 350S SMART TECHNOLOGY ELECTRIC SHOWER Installation and User Guide ...

Страница 2: ...gy and a unique dual control combining on off power select and flow temperature control Your shower is designed to stabilise temperature changes caused by water pressure fluctuations These can result from toilets being flushed or taps being turned on and off When this happens your showering temperature will be held within a controlled band provided that the minimum pressure required by the shower ...

Страница 3: ...nner knob B will rarely need adjusting You must however take into account required adjustments for variations of incoming mains water temperature between summer and winter see Effect of Seasonal Incoming Water Temperature Changes 6 When you have finished showering turn outer knob A anti clockwise to the stop position Water will continue to flow for approximately 7 seconds before switching off This...

Страница 4: ...uired water temperature is achieved by adjusting the rate of water flow Diagram 3 shows the principle involved in relating temperature rise to flow rate The higher the water rate the lower the temperature and vice versa The temperature of the water supplied from the mains can vary considerably throughout the year from 5 to 20 C This means that in the winter flow rate will be less than in the summe...

Страница 5: ...a comfortable showering temperature has been reached You MUST WAIT approximately 20 seconds for each adjustment to affect the water temperature medium setting may need to be selected Water too HOT Increase water flow by adjusting inner knob B anti clockwise direction of the blue arrows medium setting may need to be selected Increase pressure to water supply e g fully open service valve or stop coc...

Страница 6: ...abiliser valve Check stabiliser is in place and remove any debris in valve Water leaks from burst pressure relief valve Check for cause of high pressure and remove it Blockage on outlet e g blocked shower handset Replace the pressure relief disc not covered by guarantee Water does not flow when outer knob A is turned Check circuit through solenoid coil If defective then replace Check circuit throu...

Страница 7: ...t arrangement taking the following into account The possible need to use the handset over the sink for hair washing etc The heater must not be mounted in the direct spray from the handset The handset must not be able to come into contact with used water in the cubicle bath or basin If it can even after the hose has been retained by the soap dish see separate accessories fitting instructions sheet ...

Страница 8: ...ommended that a WRAS Water Regulations Advisory Scheme listed isolating valve is fitted between the rising main and the unit This will allow the unit to be serviced or exchanged without having to turn off the water at the water stop valve 3 The heater can be fed from a header tank provided this has a minimum head of 7 metres 23ft 4 Ø15mm copper or stainless steel pipe should be used To avoid cross...

Страница 9: ...ype B MCB 27m Max 45m Max 8 5 7 8kW 240 230V 6 0mm 10 0mm 45A BS 1361 fuse 12m Max 21m Max 6 0mm 10 0mm 40A Type B MCB 27m Max 45m Max 9 5 8 7kW 240 230V 6 0mm 10 0mm 45A BS 1361 fuse 12m Max 21m Max Remember to upgrade the cable if it runs in thermal insulation in a loft or for a longer distance 2 A means for disconnection in all poles must be incorporated in the fixed wiring in accordance with t...

Страница 10: ...low can be adjusted by inner control knob B c Power selection operates in all 3 positions giving a change in water temperature and that the neon light functions correctly d Check again for leaks e That the holes in the shower handset are not blocked 8 DEMONSTRATE OPERATION TO USER Please Note The fitting of Spare Parts must be supervised by a suitably qualified person White 2 metre Shower Hose Cat...

Страница 11: ... of terms and conditions are available on request from APPLIED ENERGY PRODUCTS LIMITED MORLEY WAY PETERBOROUGH PE2 9JJ TEL 44 0 1733 456789 FAX 44 0 1733 310606 Website www redring co uk GUARANTEE AND CONTACT DETAILS ...

Страница 12: ... need to adjust inner knob B 5 Water will continue to flow for approximately 7 seconds before switching off This reduces the temperature of the water in the tank for the next user The neon indicator light will go out 6 Switch off the electricity supply at the ceiling switch or local isolator Notes Wait 20 seconds for the temperature to stabilise after each adjustment The neon indicates when the he...

Отзывы: