■
FUELING THE UNIT (OP1)
1. Remove the fuel tank cap and pour fuel into the
tank up to 80% of full capacity.
2. Fasten the fuel cap securely and wipe up any
fuel spillage around the unit.
3. Remove the oil tank cap and pour chain oil into
the tank. Fasten the cap securely.
1. Select bare ground for fueling.
2. Move at least 10 feet (3 meters) away from the
fueling point before starting the engine.
3. Stop the engine before refueling the unit.
■
STARTING ENGINE
Keep clear of the saw chain as it will start
rotating upon starting of the engine.
1. Put the ignition switch to “ I ” position. (OP2)
2. While holding the throttle lever together with the
throttle interlock, push in the side button and
release the throttle lever to hold it at the start
position. (OP3)
3. Pull out the choke knob to the closed position.
(OP4)
When restarting immediately after stopping the
engine, Ieave the choke knob at the open position.
4. While holding the saw unit securely on the
ground, pull the starter rope vigorously. (OP5)
Do not start the engine while hanging the chain
saw with a hand. The saw chain may touch
your body. It's very dangerous.
5. When engine has ignited first, push in the choke
knob and pull the rope again to start the engine.
6. Allow the engine to warm up with the throttle
lever pulled slightly.
WARNING
NOTE
WARNING
WARNING
7. Operation
OP1
OP2
OP3
OP4
OP5
❲
11
❳