background image

 

 

 
 

B1500002 

 

 

English 5 (6)

 

  

Process Content 

13 

Put the unit onto the frame. 

14 

Secure two screws for the upper damper from back side. 

  

 

  
  
  
  
  
  
  

Tightening torque 

→ 3Nm 

15 

Secure two nuts for the lower damper from bottom side. 

  

 

  
  
  
  
  
  
  

Tightening torque 

→ 5Nm 

16 

Connect spark plug cable to spark plug. 

  

 

  
  
  
  
  
  
  

  

17 

Connect the fuel lines to the carburetor. 

  

 

  
  
  
  
  
  
  

  

 

 

Содержание EBZ7500

Страница 1: ...se from the surrounding plastic Modified metal sleeves that prevent play are now cast into impeller 589 26 61 01 in production 17 August 2015 as from serial number in Table 1 Tools required for reworking 10mm socket T handled tap set M5 5mm x 0 8 Air to blow out shavings T27 Torx bit Torque wrench up to 12Nm required Parts information New part no Part description Old part no 589 26 61 01 fans prod...

Страница 2: ...description Process Content 1 Take the unit out from the carton if rework 2 Unplug spark plug cable 3 Disconnect the fuel lines from the carburetor Don t use any sharp objects 4 Remove two nuts for the lower dampers from bottom side ...

Страница 3: ...B1500002 English 3 6 Process Content 5 Remove two screws for the upper damper from back side 6 Remove the unit from the frame 7 Remove twelve screws for the volute cover 8 Remove four screws for the fan ...

Страница 4: ... 01 589 26 61 01 10 Secure four screws for the fan Tightening torque 12Nm 11 If needed to chase two female threads on the upper damper and blow out 12 Secure twelve screws for the volute cover Tightening torque for ten screws 3 5Nm Tightening torque for two screws around elbow 1 0Nm 1 3 4 2 ...

Страница 5: ...to the frame 14 Secure two screws for the upper damper from back side Tightening torque 3Nm 15 Secure two nuts for the lower damper from bottom side Tightening torque 5Nm 16 Connect spark plug cable to spark plug 17 Connect the fuel lines to the carburetor ...

Страница 6: ...Content 18 Put a green marker on the base of the product if rework 19 Put the reworked unit into the carton if rework 20 Put the green dot onto the carton decal by decal or marker to clarify rework finished if rework Example 21 End ...

Отзывы: