
• INSTALLING THE REEL
1. Insert each end of the line through the
eyelet on the outer spool. Then pull the end
firmly to release the line from the holding
slot.
MAINTENANCE
1
4
6
2
5
7
3
7.6m
(25')
3.8m
(12.5')
Ø2.4mm
0.095In
2. Hold the inner reel in place and screw in the
Bump Knob bolt in the correct direction
(
clockwise for BT2200LDC and
BC2200E).
B : INSTALLING A PREWOUND REEL
1. Follow the instructions in
DISASSEM-
BLING THE HEAD.
2. Follow the instructions in
INSTALLING THE
REEL.
II
. Bump head for BC2200LDC
10
Содержание BC2200E
Страница 2: ......
Страница 13: ...MAINTENANCE 8 11 14 1 2 9 10 12 13 15 THIS SIDE UP THIS SIDE UP WIND LINE 11...
Страница 20: ...Fig 5 ENGINE GROUP FOR BT2200LDC BC2200E BC2200LDC HE2200LDC 18...
Страница 24: ...KOMATSU ZENOAH AMERICA INC 1505 Pavilion Place Suite A Norcross Georgia 30093 Printed in the USA...