DropBear_UserManual
RE_PROD_0012 Version2
Page 8 of 22
Date Issue 28/07/2020
Attached to the top of this chamber there are two fully enclosed battery busbars with the correct
number of battery cables required.
The DropBear is tested and commissioned at RedEarth’s headquarters before shipping. All
parameters are pre-set for correct operation between the SP Pro inverter, the Fronius and the
battery bank.
Some parameters may need to be adjusted during installation (eg. Generator size, maintenance
run, etc). Please check DropBear Commissioning section in this manual as well as the Selectronic
Manual.
You can reach RedEarth Energy Storage Ltd
during business hours on
On 0487 002 451 for Technical Support or
Head Office on 1800 733 637 (+61 7 3279 6707).
Overview