Auxiliary
Battery
Start
Battery
40 A Fuse
(and holder)
40 A Fuse
(and holder)
< 150 mm (6")
< 150 mm (6")
FUSE KIT ASSEMBLY
Order of installing Bolt in the Fuse Holder:
1. MIDI Fuse
2. Lug with Heatshrink and cable
3. Spring Washer
4. Nut
LUG AND HEATSHRINK ASSEMBLY
Strip the end of the cable back
enough to ensure the insulation
does not enter the barrel of the
Lug when fully inserted.
Slide the Heatshrink over the
cable.
Insert the stripped wires into the
barrel of the Lug.
Crimp the Lug using the correct
crimping tool.
Slide the Heatshrink to partially
cover the Lug, leaving the Lug
tongue exposed.
Shrink the Heatshrink.
BCDC1225D, BCDCN1225 & BCDC1220 INSTALLATION
Auxiliary and Start Battery Connection
Содержание FK40
Страница 1: ...40A MIDI Fuse Kit FK40 ...