COPYRIGHT © 2015 RED.COM, INC
REDLINK BRIDGE OPERATION GUIDE
955-0064, REV-D | 11
03
This chapter explains how to install and power the REDLINK™ Bridge.
NOTE:
The REDLINK Bridge is HOT SWAPPABLE, meaning you can remove or install the module while the cam-
era is powered on.
DOCK THE REDLINK BRIDgE
1. Slide the REDLINK™ Bridge over the V-Mount on the back of the DSMC
®
BRAIN
®
or compatible rear mod-
ule.
You will hear a click, which indicates that the REDLINK Bridge is securely attached.
The REDLINK Bridge is automatically powered when connected.
Dock the REDLINK Bridge
INSTALL THE
REDLINK BRIDgE