Red Sea ReefMat
®
19
ENG
Thread the free edge of the fleece-mat into the slot in the take-up shaft
and rotate the top side forwards (so that the new material comes from
the bottom rear of the shaft) for a few turns to firmly attach the material
to the shaft. Lower the shaft to its operating position in the Head and
rotate slightly as the gears on the shaft engage with the gears on the
drive-unit. Close the side locks to hold the shaft in position.
To insert the fleece-mat into the mat-retainer, slide the top assembly out
of the lower grid.
Place the grid under the fleece-mat with the openings for the guide
rollers facing forwards and slide the top assembly back into position.
Then rotate the tube so that the slots are facing upwards.
Содержание ReefMat 1200
Страница 1: ...User Manual ENG DE FR ...
Страница 2: ......
Страница 3: ...Red Sea ReefMat 3 ENG User Manual Smart Plug Play Efficient ...
Страница 14: ...Red Sea ReefMat 14 Mount the level sensor to its operating position on the filter chamber B A C D ...
Страница 32: ...Red Sea ReefMat 32 ...
Страница 33: ...Red Sea ReefMat 33 DE Benutzerhandbuch Smart Plug Play Effizient ...
Страница 44: ...Red Sea ReefMat 44 Montieren Sie den Niveausensor an seiner Betriebsposition an der Filterkammer B A C D ...
Страница 62: ......
Страница 63: ...Red Sea ReefMat 63 FR Notice d utilisation Smart Plug Play Efficace ...