16
USER MANUAL
▪
Red Rooster Lifting Limited
▪
Nauta House, The Meadows, Oldmeldrum, Aberdeenshire, AB51 0EZ
▪
Tel: +44 (0) 1651 872101
▪
M01-AH12-AT REV1
GETTING STARTED - INSTALLING THE HOIST & TROLLEY
1.9
SETTING THE TROLLEY (up to 3 tonne)
1)
Slide the hook receiving part or link plate near the suspended shaft centre and grease the shaft.
2)
Distribute the spacer rings and adjusting collars equally to either side of the link plate, in order to obtain the dimensions between the
wheels, corresponding to the beam width plus 2 or 3mm.
3)
Distribute on each side of the side plates, washers and adjusting collars that are remaining and screw a nut on each extremity.
4)
Tighten the nuts and lock nuts on the load bar and check the clearance between the beam flange and the
wheel
flange.
5)
Position the tie-rods, anti-tilt rollers, washers and nuts into the slots in each of the side plates. Set to give the minimum amount of
clearance between the underside of the beam and the top of the anti-tilt roller. Then tighten the nut against the roller and side plate and
re-check the wheel setting.
PLAIN
SIDE-PLATE
MOTOR
SIDE-PLATE
WHEELS
ANTI-TILT
ROLLERS
TIE
BAR
LOAD
BAR
SPACER
WASHERS
SPACERS
BUFFERS