ASSEMBLY AND INSTALLATION - LHR, ULHR & ARTICULATED TROLLEY
1.10
▪
The fitting of an articulated trolley will depend on the design of the power transfer between the trolley drive wheels. This can either be
with a motor gearbox at one side with a transfer shaft across to the geared wheel on the plain side plate or the trolley can have a motor
gearbox on both side plates to drive the trolley.
▪
The fitting of the trolley on to the beam can either be from the end of the beam or the trolley can be opened up to fit over the beam
flange.
MOUNTING FROM THE END OF THE RUNWAY BEAM
▪
Check the trolley wheel setting against the runway beam flange size (the setting should be as per the standard trolley setting)
▪
Remove the runway beam end stop and slide the assembled trolley on to the runway beam past the position for the end stop and then
re-fit the end stop
▪
Check the wheel setting and connect the air supply then function check the trolley without load along the straight and curved sections of
the runway beam.
▪
If the trolley runs along the working area without problem lift the SWL for the hoist and trolley and travel along the runway beam
checking for any problems travelling around the curves and over joints.
MOUNTING BY DISMANTLING THE MAIN TROLLEY BODY (TRANSFER SHAFT) - CAUTION
▪
If the trolley is fitted with a transfer shaft and the load bars are made for a set size, several parts such as the transfer shaft, gears,
and bolts will have to be removed at ground level when opening the trolley and then refitted when the trolley side plates are positioned
at either side of the runway beam.
▪
Position one or two hoists at either side of the runway beam, connect the bottom hooks the lifting points on the trolley side plates and lift
the trolley side plates up to a position where the trolley wheels are level with the beam flange.
▪
While holding the transfer shaft and load bars in position close the plain side plate on to the beam lining up the transfer shaft gears and
load bars. Check the security of the shafts, load bars and tie bars.
▪
Carry out checks and function tests as per item 1
MOUNTING BY DISMANTLING THE MAIN TROLLEY BODY (DUAL MOTORS)
▪
Where dual air motor are mounted on two trolley side plates this allows for the trolleys to be easily opened up at ground level, lifted up
and then closed on to the beam flange.
▪
Check trolley flange setting matches the runway beam flange
▪
Position the hoist and trolley under the beam where the hoists is to be installed
▪
Position two or four hoists above the runway beam and connect the bottom hooks to the lifting points on the trolley side plates.
▪
Slacken the load bar and tie bar nuts so that the side plates can slide apart, then check the opening between the inside of wheels is
wide enough to go past the beam flange.
▪
Keeping the trolley level lift the trolley wheels up to the level of the beam flange.
▪
Next push the trolley side plates together, then tighten the nuts on the load bar and tie bars, check all parts are secure.
▪
Check the trolley wheel setting on the beam (as per standard trolley) and then connect the air supply and function test the trolley without
load along the full length of the curved and straight sections of the runway beam.
▪
Next with the SWL of the hoist and trolley run the trolley along the runway beam checking movement around any curved sections and
over
joints.
Title of project
Material
Weight
Checked by
Designed by
Approved by
Scale
Title of part
Part number
Revision number
Replaces draw
Su
rn
am
e
D
at
e
Si
gn
at
ur
e
Articulated beam trolley SWL 6T
2011-04-26
-
202kg
Date
-
0
1:5
Assembly
DRG 1473-00
T. Mikolajewski
S. Przygoda
B. Aitken
red rooster
Red Rooster Industrial (UK) Ltd,
Nauta House, The Meadows,
Oldmeldrum, Aberdeenshire, AB51 0EZ
Tel: +44(0)1651 872101
Main Fax: +44(0)1651 872098
Sales Fax: +44(0)1651 871405
www.rriuk.com
Title of project
Material
Weight
Checked by
Designed by
Approved by
Scale
Title of part
Part number
Revision number
Replaces draw
Su
rn
am
e
D
at
e
Si
gn
at
ur
e
Articulated beam trolley SWL 6T
2011-04-26
-
202kg
Date
-
0
1:5
Assembly
DRG 1473-00
T. Mikolajewski
S. Przygoda
B. Aitken
red rooster
Red Rooster Industrial (UK) Ltd,
Nauta House, The Meadows,
Oldmeldrum, Aberdeenshire, AB51 0EZ
Tel: +44(0)1651 872101
Main Fax: +44(0)1651 872098
Sales Fax: +44(0)1651 871405
www.rriuk.com
Содержание TCS-500-AT2S-LF
Страница 1: ...LUBE FREE AIR HOIST TROLLEY USER MANUAL MODEL TCS 500 AT2S LF...
Страница 2: ......
Страница 44: ......
Страница 60: ......