Section 5.7:Scheduled Actions
63
•
Pending Actions
are actions that have not started or are in progress.
•
Completed Actions
are actions that have been completed.
•
Archived Actions
are actions that you have selected to archive.
In each tabbed page, each row in the list represents a single scheduled event or action that might affect
multiple systems and involve multiple packages.
The list includes six columns of information:
•
Select
— Use the checkboxes in this column to select actions. After selecting actions, you can
either add them to your selection list or move them to the
Archived Actions
list. If you archive a
pending action, it is not cancelled, the action item just moves to the
Archived Actions
list so you
do not see it in the
Pending Actions
list.
•
Action Type
— Type of action to perform such as Errata Update or Package Install.
•
Earliest Action
— The earliest day and time to perform the action.
•
Completed
— Number of systems on which this action has been completed.
•
Failed
— Number of systems on which this action has been tried and failed.
•
In Progress
— Number of systems on which this action is taking place.
If you click on a link under the
Action Type
column, you can view details for the action. For example,
for an Errata Update action, you can view which Errata Updates are to be applied, which systems are
currently performing the Errata Update, which systems have completed the action, and which systems
tried the action but failed to complete it.
Содержание NETWORK - USER REFERENCE GUIDE 3.1
Страница 1: ...Red Hat Network User Reference Guide 3 1 ...
Страница 26: ...26 Chapter 2 Red Hat Network Registration Client ...
Страница 64: ...64 Chapter 5 Software Manager Figure 5 6 Scheduled Actions ...
Страница 66: ...66 Chapter 6 Red Hat Network Daemon ...
Страница 68: ...68 Chapter 7 Using Red Hat Network with Red Hat Linux 6 2 ...
Страница 72: ...72 Chapter 8 Frequently Asked Questions ...