PAGE 1 (FRONT PAGE)
T: 0800 195 0006
Red Arrow Electrical Distribution
Cortonwood Drive, Brampton,
Barnsley, S73 0UF
INSTALLATION
INSTRUCTIONS
PRODUCT:
PHOTOCELL
PRODUCT CODES:
PC10A & PC10AH
redarrowelectrical.co.uk
1.
CAREFULLY CHOOSE THE CORRECT POSITION TO INSTALL THE PHOTOCELL KIT CONSIDERING THE FOLLOWING GUIDE LINES:
•
WHERE POSSIBLE THERE SHOULD BE A CLEAR VIEW OF THE SKY, ALLOWING SUFFICIENT DISTANCE WHEN MOUNTING
UNDER EVES.
•
FOR OPTIMUM PERFORMANCE THE POSITION CHOSEN SHOULD HAVE A CLEAR VIEW OF NORTH.
•
BE AWAY FROM VIEW OF ANY ARTIFICIAL LIGHT SOURCE.
•
BE AWAY FROM VIEW OF THE LIGHT SOURCE THE UNIT IS TO CONTROL.
2.
SECURELY FIX THE BASE HOLDER TO A VERTICAL WALL SO THAT THE HEAD WILL BE FACING UP WHEN FITTED.
3.
FIT THE GASKET INTO THE BASE HOLDER FOAM SIDE UP.
4.
ENTER THE SUPPLY & LOAD CABLE INTO THE BASE THROUGH THE HOLE IN THE BOTTOM OF THE BASE ENSURING THAT A
CABLE GLAND GROMMET OR SEALING COMPOUND IS USED TO MAINTAIN THE IP RATING OF THE UNIT.
5.
TERMINATE THE CABLE INTO THE NEMA SOCKET OBSERVING THE CORRECT CONNECTIONS;
“LI” = LIVE (SUPPLY IN)
“LO” = LOAD (SUPPLY OUT)
“N” = NEUTRAL (THE NEUTRAL TO THE LOAD DOES NOT NEED TO PASS THROUGH THE UNIT AND CAN BE TAKEN DIRECTLY).
6.
PLACE THE NEMA SOCKET INTO THE BASE HOLDER WITH THE ARROW PRINTED ON THE SOCKET POINTING TOWARDS NORTH.
IF NORTH IS LOCATED BEHIND THE UNIT TOWARDS THE MOUNTING SURFACE THEN THE ARROW SHOULD BE ALIGNED
POINTING IN THE DIRECTION OF BEST NATURAL LIGHT.
7.
THE BASE HOLDER HAS 2 LOCATING PINS FOR THE NEMA SOCKET TO FIT ONTO, THE NEMA SOCKET SHOULD THEN BE
SECURED USING THE 2 COUNTER SUNK SELF TAPPING SCREWS PROVIDED.
8.
ALIGN THE LARGEST OF THE 3 BRASS FEET MARKED ‘NEUTRAL’ ON THE PHOTOCELL HEAD WITH THE LARGEST SLOT IN THE
NEMA SOCKET, PUSH THE PHOTOCELL HEAD INTO THE NEMA SOCKET AND GENTLY TURN CLOCKWISE TO LOCK INTO PLACE.
INSTALLATION INSTRUCTIONS -
PAGE 2 (TWO - INSIDE DPS)
•
THE PHOTOCELL ALWAYS POWERS UP IN THE “ON” POSITION, IF IN BRIGHT DAYLIGHT IT WILL SWITCH OFF WITHIN 2 MINUTES.
•
TO TEST FOR CORRECT OPERATION COVER THE PHOTOCELL WITH THE PACKING BOX, AFTER A SHORT DELAY, 15-120 SECONDS,
THE PHOTOCELL WILL OPERATE AND POWER WILL BE APPLIED TO THE LOAD. IF TESTED IN BRIGHT DAYLIGHT AFTER A SIMILAR
DELAY THE PHOTOCELL WILL TURN OFF THE POWER TO THE LOAD WHEN THE PACKAGING BOX IS REMOVED.
•
THE LOAD STAYS ON:
THE PHOTOCELL IS IN A SHADY OR DARK POSITION.
THE NEUTRAL IS NOT CONNECTED.
•
THE LOAD IS FLASHING, STROBING OR SWITCHING ON AND OFF REPEATEDLY THROUGH HOURS OF DARKNESS:
THE PHOTOCELL IS TOO CLOSE TO THE LIGHT SOURCE IT IS CONTROLLING.
“LI” & “LO” ARE REVERSED.
COMMON PROBLEMS -
OPERATION & TESTING -
INS/
ACCESSORIES/0001/PC10/V2