REAX
RAFT
| 13
QUICK START |
• Anchor the locking systems (1) to the lane ropes, observing the recommended distances as
from fig. 11-12-13
• Pull REAX RAFT out of its package
• Lay the unit on a flat surface, making sure no object may damage it
• Make sure to place REAX RAFT with the workout area upwards
• Find the inflation valve (2)
• Find the inflation system (3)
• Insert the inflation system inside the valve
• The working pressure of the REAX RAFT is 1,1 bar
• Remove the inflation system after use and store it in a dry place
• Hand-tighten the inflation valve
• Anchor the karabiners (4) to the central side D-rings (5).
• Insert the elastic chords linked to the karabiners (4) in the central side D-rings (5).
• Fix the extremities of the elastic chords on the hooks (6). Watch the video tutorial:
https://youtu.be/ipIjFGh7_to
• Fix the hooks (6) to the locking systems (1) previously anchored to the ropes. Watch the
video tutorial:
https://youtu.be/DBBBRbBBopo
Customized anchoring kits are available upon request.
• Inflated REAX RAFT sizes: 200x90x15cm / 6,56x2,9x0,49ft
• Maximum load capacity: 160kg / 350lbs
ASSEMBLY INSTRUCTIONS
3
Содержание REAX RAFT
Страница 1: ...QUICK START RAFT MANUAL REAXRAFT THE FLOATING BOARD ...
Страница 2: ......
Страница 6: ...REAXRAFT 6 QUICK START 1 1 8 6 2 9 3 5 4 10 7 1 1 REAX RAFT ...