Marble Margin Set Installation Procedure
OPTIONAL MARBLE HEARTH AND/OR MARGIN SET
(Inbuilt & ZC models only)
1.
Install Pyrotech without trim.
2.
Install marble up to flange on Pyrotech. Use liquid nails to fix to wall. Marble should look
like the diagram below once it has been installed and before mantelpiece has been
attached.
3.
Once unit is all set up, attach trim. Trim should overlap the marble so that the switches are
accessible.
Firebox
1190mm
270mm
620mm
375mm
275mm
1810mm
29