Reach PoE4N Tester Manual 1.4
08/09/2017
Page 24
B.4
Power Status and overload (IEEE 802.3af)
RT-PoE commands:
PSE action
reset
connect on
detect ok
class 3
set 20
Enable power to port
Verify that PSE sees that device taking power.
status
(verify that power is
on)
meas2
(verify that voltages
are as expected )
set 350
(Verify that PSE is providing full power)
set 390
(Verify that PSE sees overload and shuts off
power)
status
(verify that power is
off)
B.5
Power Status and overload (IEEE 802.3at)
Same as above, but use “class 4”, and “set 600” for full power and “set 660” for overload
B.6
Power Status and overload (UPoE)
Same as above, but use “set 1200” for full power and “set 1320” for overload
B.7
Data transmission under power (IEEE 802.3af)
RT-PoE commands:
Check after commands issued
(as above for
specific test
required)
Enable power to port
Verify that PSE sees that device powers up.
status
(verify that power is
on)
ext on
Run traffic test between port pairs 1 and 2, 3 and
4,…23 and 24. Verify no errors.