Re ROCKCRETER OPTIMIX 1.5 Скачать руководство пользователя страница 21

OPERATORS MANUAL 

FOR 

ROCKCRETER OPTIMIX 1.5 

 

 

 

PAGE 17 

1. BODY 

ASSEMBLY 

ITEM NO  DESCRIPTION 

PART NO 

QTY 

COMMENTS 

1 MEDIUM 

DUTY WHEEL 

EA006-1 

 

2  380V 3KW MOTOR 

EA027A 

 

3  24V AC SOLENOID 

EA070 

 

4 LIMIT 

SWITCH 

EA071 

 

5 STATOR 

RETAINING BOLTS 

KGPF017-320 

 

6  DISCHARGE OUTLET 32MM 

KGPF005 

 

7 TSL 

STATOR 

KGPF004A-1 

 

8 TSL ROTOR 

KGPF004A-2 

 

9 OPTIMIX AUGER 

KGPF003B 

 

10 OPTIMIX DRIVESHAFT 

KGPF007B 

 

11 OPTIMIX 380V CONTROL PANEL 

KGPF037OP 

 

12 OPTIMIX GEARBOX 

KGPF205 

 

13  OPTIMIX MOTOR COVER 

KGPF009OP 

 

14  OPTIMIX GEARBOX FRAME 

KGPF 024OP 

 

15 OPTIMIX SIEVE 

KGPF012OP 

 

16  OPTIMIX PIN SET 

KGPF012OPA 

 

   

 

 

 

   

 

 

 

   

 

 

 

   

 

 

 

Содержание ROCKCRETER OPTIMIX 1.5

Страница 1: ...Box 18924 Sunward Park 1470 361 Crocker Road Wadeville Germiston South Africa Co Reg no 1947 24677 07 TEL 2711 865 3019 e mail information rockcrete co za www rockcrete co za As part of our policy of...

Страница 2: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE i Intentionally Left Blank...

Страница 3: ...TION 2 3 1 Materials 3 3 2 Flow 3 3 3 Setting Time 3 3 4 Pumping Distance 3 3 5 General Procedures 4 4 OPERATING PROCEDURES 6 4 1 Set Up 6 4 2 Priming with Water 6 4 3 Prime with Material 7 4 4 Preven...

Страница 4: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE ii Intentionally Left Blank...

Страница 5: ...many pumping operations that are performed off the ground All platforms should be equipped with safety rails h A qualified electrician must do all electrical connections i Do not remove the screen si...

Страница 6: ...endant Vertically Up to 15m Electric drive 3kW 220V 380V 525V 3 PRINCIPLES OF OPERATION NOTE The principles of operation offered herein are intended as an aid to help the operator identify some of the...

Страница 7: ...uce the setting time This is particularly true of repair mortars and other spray applied materials so that strength gain can be fairly rapid It is important to keep moving when using these types of ma...

Страница 8: ...eeding to the other 3 Mix slurry composed of Portland cement in approximate proportions of 25 litres of water to a bag of cement and pump this through the grouting system This is to remove any residua...

Страница 9: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE 5 Figure 1...

Страница 10: ...zzle to the hose outlet 3 Place the nozzle into a waste container 4 Turn the main power disconnect switch to the ON position 5 Open the ball valve directly before the water system bypass outlet 6 Pres...

Страница 11: ...is normally in the Neutral position The switch must be held in the REV position to reverse the pump direction The switch will return to the Neutral position when released If the pump has not broken fr...

Страница 12: ...ready to spray 4 4 Prevent Blocking 1 To prevent Blocking in the pump or hose follow the steps below a Use the lowest pressure and largest nozzle size that provides an acceptable spray pattern This w...

Страница 13: ...ease the pump direction switch The switch will return to its normal position 6 Turn the main power disconnect switch to OFF 7 Allow time for material to drain to relieve any remaining pressure 8 If yo...

Страница 14: ...the motor shaft adapter and clean out shaft touch e Make sure the motor shaft adapter and clean out shaft are aligned so the clean out shaft slides into the motor shaft adapter slot If the do not alig...

Страница 15: ...llest clean out ball c Attach the hose to the water system bypass outlet open the ball valve and press the drain button to resume flushing the hose d The hose clean out ball will be pushed out of the...

Страница 16: ...terial in pump assembly Clean or replace the pump assembly Poor finish or irregular spray pattern Inadequate air assist air pressure Adjust the air assist air pressure output on the applicator Pump is...

Страница 17: ...ose connections Check connections in electrical enclosure Check for correct voltage supply at the disconnect voltage supply at the disconnect and VFD terminals L1 L2 and L3 Motor overload relay trips...

Страница 18: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE 14...

Страница 19: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE 15 ILLUSTRATED PARTS CATALOGUE CONTENTS LIST Figure Description Page No 1 BODY ASSEMBLY 16 2 HOSE AND NOZZLE ASSEMBLY 18...

Страница 20: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE 16 1 BODY ASSEMBLY...

Страница 21: ...ITCH EA071 1 5 STATOR RETAINING BOLTS KGPF017 320 2 6 DISCHARGE OUTLET 32MM KGPF005 1 7 TSL STATOR KGPF004A 1 1 8 TSL ROTOR KGPF004A 2 1 9 OPTIMIX AUGER KGPF003B 1 10 OPTIMIX DRIVESHAFT KGPF007B 1 11...

Страница 22: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE 18 4 HOSE AND NOZZLE ASSEMBLY...

Страница 23: ...CK S STEEL W006J 75I 1 3 A CAMLOCK S STEEL W005A 75I 2 4 F CAMLOCK S STEEL EA050A 1 5 NOZZLE WITH EXTENSION KGPF021 1 6 PLASTER NOZZLE TIP KGPF021A 1 7 B CAMLOCK S STEEL W006O 1 8 NOZZLEBODY TAP PV18...

Страница 24: ...OPERATORS MANUAL FOR ROCKCRETER OPTIMIX 1 5 PAGE 20...

Отзывы: