Establish a known flow rate through the meter corresponding to approximately 90% of full
scale and observe the meter indication. Move the cam follower up to decrease the pointer
indication or down to increase the pointer indication.

To move the cam follower up, rest a screwdriver on the cell block with the blade between
the cell block and the center shaft. Pry gently up on the cam follower. To move the cam
follower down, place a screwdriver on the top of the cam follower. With the blade resting
against the case press gently down. Take care not to put excessive forward pressure on
the cam follower to prevent the "C" clip on the pivot shaft from coming off. Rezero the meter
using the cam nut.

Cam Follower Adjustment

Figure 7

Check meter indication at 50% of full scale. Meter should indicate actual flow rate within
3% of full scale. If meter does not indicate actual flow, consult factory.

4.7

Cleaning of Pressure Ports

Remove the meter housing from the body by removing 4 screws. Remove the pulsation
snubbers from the body by inserting a small wood screw into the hole in the pulsation
snubbers and gently pull them out. Clean passages in body and snubbers and reassemble.
If you are unable to clean without further disassembly, the meter should be returned to the
factory for service.

Reassemble the meter housing to the body in the desired viewing position. Take care to
properly seat the inner and outer o-rings before tightening screws.

4.8

Adjustment of Reed Switches

Check the meter zero and correct if necessary using the coarse or fine zero procedure
before proceeding. Connect continuity tester to N.O. contact. Loosen the switch clamp.
Establish the desired flow rate for switch tripping. Slide switch to left most position.
Range window should show a partial or complete green mark.Slowly slide to right while
monitoring N.O. contact. Switch will close. Continue to slide to right. Switch will open
(false trigger). Continue to slide to right until switch closes again. Adjust by sliding to
right to raise setpoint, left to lower. Tighten clamp. Note: Tiny adjustments may be re-
quired to reach the desired set point.

4.

Operation
and

Mainte-
nance

(Continued)

INCREASE

INDICATION

DECREASE

INDICATION

CAM
FOLLOWER

Reed Switch Adjustment
Figure  8

adjustment clamp screws

terminal strip

set point range windows

Содержание Flo-Gage 7000 Series

Страница 1: ... Operation and Maintenance 4 4 4 4 4 4 1 Preventive Maintenance 4 4 2 Checking Zero 4 4 3 Checking the Pointer Preload 4 4 4 Coarse Zero Adjustment 4 4 5 Fine Zero Adjustment 5 4 6 Flow Calibration 5 4 7 Cleaning of Pressure Ports 6 4 8 Adjustment of Reed Switches 6 5 5 5 5 5 T T T T Troubleshooting roubleshooting roubleshooting roubleshooting roubleshooting 6 6 6 6 6 5 1 Pointer Fluctuations 6 5 ...

Страница 2: ... should be transitioned to pipe at least 10 diameters up stream of the meter to achieve rated accuracy Avoid placing the meter where it will be subjected to water hammer and mount the meter rigidly to minimize shock or vibration Meters installed outdoors or exposed to splashing liquids should be ordered with a gasketed case Protect from freezing liquids 1 Principle of Operation Installation Planni...

Страница 3: ... housing Do not remove the two screws holding the housing to the cell block assembly Position the housing at any 90 degree position Replace the four screws taking care not to pinch the o ring seals O Ring Installation Figure 3 3 3 Changing from Horizontal to Vertical or Vertical to Horizontal Remove the lens by rotating counter clock wise by hand Do not remove the pointer Move the dial forward by ...

Страница 4: ...hen follow FINE ADJUST MENT procedure to rezero pointer If the pointer is positioned more than 1 2 12 mm from the stop pin then follow the COARSE ADJUSTMENT procedure Zero Reference Point Pointer preload Figure 4 Figure 5 4 3 Checking the Pointer Preload If the fine adjustment has been performed repeatedly the pointer return spring preload should be checked Manually rotate the pointer CCW toward f...

Страница 5: ... not use this procedure Do all ajustments with the coarse zero adjustement Adjustment of the fine zero using this method will require recalibration of reed switches or transmitter Grip the pointer close to the hub on both sides of the hub and rotate the hub with respect to the pointer The pointer should aim directly at the zero reference point printed on the dial as shown in figure 4 Gently tap th...

Страница 6: ...ood screw into the hole in the pulsation snubbers and gently pull them out Clean passages in body and snubbers and reassemble If you are unable to clean without further disassembly the meter should be returned to the factory for service Reassemble the meter housing to the body in the desired viewing position Take care to properly seat the inner and outer o rings before tightening screws 4 8 Adjust...

Страница 7: ... Meter Response Sluggish meter response can be caused by inadequate pointer return spring preload or by clogging of the pressure passages with debris To check spring preload see CHECKING THE POINTER PRELOAD To clean the pressure passages see CLEANING OF PRES SURE PORTS 6 1 Liquid Service If the specific gravity of the fluid being metered differs from the value marked on the meter dial a correction...

Страница 8: ...M at an actual temperature of 70 F and pressure of 85 psig What is the actual flow rate K æ è ç ö ø æ è ç ö ø 85 14 7 80 14 7 100 460 70 460 Therefore actual flow rate 1 05 x 100 105 SCFM 6 Correction Factors Continued INDICATOR ASSEMBLY GEAR MOVEMENT HOUSING PULSATION SNUBBERS METER BODY FLOW 6 2 Compressed Gas Service If the gas pressure or temperature varies from the values marked on the meter ...

Отзывы: