Photo 12
Rotate the PM Assembly so the Cam Adjustment
Bracket is aligned with the Bullet Feeder’s Push Bar
mechanism. Adjust the position of the Cam and “L”
shape Bracket so it will activate the Push Bar, allowing
bullets to drop one at a time. There should be only a
slight gap between the Push Bar’s bottom edge and
Cam’s radius, as well as a slight gap between the Push
Bar and “L” Bracket. Adjust the Cam’s position vertically
and horizontally to obtain this relationship (Photo 13).
(see Adjustment section for more information)
Photo 13
Next, reinstall the PM Failsafe Rod to the Bellcrank
Brackets (consult your Powder Measure Manual for
more information). Place a properly sized/ trimmed
case at the powder drop station and fully lower the
Press Handle. The Cam on the PM Assembly should
engage the Push Bar and drop a bullet into the Seat Die
Assembly. Ensure that the Cam does not contact any
other components throughout its range of motion.
Bowl Assembly Installation
Install the Upper Tube (#781240 or 781241) into the
Bullet Feeder Bowl (Photo 14). Slide one end of the
Continuous Spring into the Upper Tube. The other
end will slide into the Switch Block Assembly later.
Photo 14
Attach the Collator Bowl Assembly to the top of the
Support Tube Assembly with the 1/4-28 x 2” BHCS and
a 1/4-28 Hex Nut (A) (see Photo 15) supplied with your
Bullet Feeder Bag #3. Tighten this just enough so that
the Bowl Assembly will still pivot. Install the Bracket Pin
into the middle adjustment position (B). See Trouble-
shooting section of your Rifle Bullet Feeder Manual for
more information.
Photo 15
Triangular
Bracket
Lower
Platform
Small Gap
Between Cam
Small Gap Between
“L” Bracket
8