RBI Futera II Modulation Скачать руководство пользователя страница 42

Finned copper tube gas boilers & water heaters – Boiler Manual

42

NOTICE! 

Commonwealth of Massachusetts

 

 

Installation Requirements  

MACODE-3

   In the Commonwealth of Massachusetts, the installa-

tion must be performed by a licensed plumber or gas  

fitter.

1.  For all side wall horizontally vented gas fueled equipment 

installed in every dwelling, building or structure used in whole 

or in part for residential purposes, including those owned or 

operated by the commonwealth and where the side wall exhaust 

vent termination is less than seven (7) feet above finished grade, 

in the area of the venting, including but not limited to decks and 

porches, the following requirements shall be satisfied:

 

d.   INSTALLATION OF CARBON MONOXIDE DETECTORS. At the 

time of installation of the side wall horizontal vented gas 

fueled equipment, the installing plumber or gasfitter shall 

observe that a hard wired carbon monoxide detector with an 

alarm and battery back-up is installed on the floor level 

where the gas equipment is to be installed. In addition, the 

installing plumber or gasfitter shall observe that a battery 

operated or hard wired carbon monoxide detector with an 

alarm is installed on each additional level of the dwelling, 

building or structure served by the side wall horizontal 

vented gas fueled equipment. It shall be the responsibility of 

the property owner to secure the services of qualified 

licensed professionals for the installation of hard wired 

carbon monoxide detectors.

 

i.   In the event that the side wall horizontally vented gas 

fueled equipment is installed in a crawl space or an attic, 

the hard wired carbon monoxide detector with alarm and 

battery back-up may be installed on the next adjacent 

floor level.

 

ii.   In the event that the requirements of this subdivision can 

not be met at the time of completion of installation, the 

owner shall have a period of thirty (30) days to comply 

with the above requirements; provided, however, that 

during said thirty (30) day period, a battery operated 

carbon monoxide detector with an alarm shall be 

installed.

 

e.   APPROVED CARBON MONOXIDE DETECTORS. Each carbon 

monoxide detector as required in accordance with the above 

provisions shall comply with NFPA 720 and be ANSI/UL 2034 

listed and IAS certified. 

 

f.   SIGNAGE. A metal or plastic identification plate shall be 

permanently mounted to the exterior of the building at a 

minimum height of eight (8) feet above grade directly in line 

with the exhaust vent terminal for the horizontally vented gas 

fueled heating appliance or equipment. The sign shall read, 

in print size no less than one-half (1/2) inch in size, “GAS VENT 

DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”.

 

g.   INSPECTION. The state or local gas inspector of the side wall 

horizontally vented gas fueled equipment shall not approve 

the installation unless, upon inspection, the inspector 

observes carbon monoxide detectors and signage installed 

in accordance with the provisions of 248 CMR 5.08(2)(a)1 

through 4. 

  Improper venting can result in excessive levels of 

carbon monoxide which can cause severe personal 

injury or death!

2.  Exemptions — The following equipment is exempt from  

248 CMR 5.08(2)(a) 1 through 4:
a.  The equipment listed in Chapter 10 entitled “Equipment 

Not Required To Be Vented” in the most current edition of 

NFPA 54 as adopted by the Board; and

b. Product Approved side wall horizontally vented gas 

fueled equipment installed in a room or structure 

separate from the dwelling, building or structure used in 

whole or in part for residential purposes.

3.   MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING 

SYSTEM PROVIDED.
a.  When the manufacturer of Product Approved side wall 

horizontally vented gas equipment provides a venting 

system design or venting system components with the 

equipment, the instructions provided by the manufacturer 

for installation of the equipment and the venting system 

shall include:

 

i.   Detailed instructions for the installation of the venting 

system design or the venting system components; and

 

ii.   A complete parts list for the venting system design or 

venting system. 

4.   MANUFACTURER REQUIREMENTS – GAS EQUIPMENT  VENTING 

SYSTEM NOT PROVIDED.
a.  When the manufacturer of a Product Approved side wall 

horizontally vented gas fueled equipment does not provide 

the parts for venting the flue gases, but identifies “special 

venting systems”, the following requirements shall be 

satisfied by the manufacturer:

 

i.   The referenced “special venting system” instructions 

shall be included with the appliance or equipment 

installation instructions; and 

  ii.   The “special venting systems” shall be Product 

Approved by the Board, and the instructions for that 

system shall include a parts list and detailed installation 

instructions.

5.   A copy of all installation instructions for all Product Approved 

side wall horizontally vented gas fueled equipment, all 

venting instructions, all parts lists for venting instructions, 

and/or all venting design instructions shall remain with the 

appliance or equipment at the completion of the installation.

  Improper venting can result in excessive levels of 

carbon monoxide which can cause severe personal 

injury or death!

Содержание Futera II Modulation

Страница 1: ...g construction Construction dust and particulate particularly drywall dust will cause contamination of the burner resulting in possible severe personal injury death or substantial property damage The...

Страница 2: ...it can cause excessive amounts of carbon monoxide resulting in severe personal injury or death DESIGNED AND TESTED ACCORDING TO A S M E BOILER AND PRESSURE VESSEL CODE SECTION IV FOR A MAXIMUM ALLOWAB...

Страница 3: ...in mm Top 6 153 30 762 Back 6 153 24 610 Left Side 6 153 12 306 Right Side 6 153 12 306 Front 6 153 30 762 2 An optimum site will be level central to the piping system close to a chimney or outside w...

Страница 4: ...within 12 in 305 mm of but not less than 3 in 76 mm from the top of the enclosure The bottom opening must be within 12 in 305 mm of but not less than 3 in 76 mm from the bottom of the enclosure Where...

Страница 5: ...sized to provide a negative draft of 03 in 0 8 mm to 1 in 2 5 mm W C at the flue outlet Common positive pressure vent systems are not to be used Improper installation can result in excessive levels of...

Страница 6: ...The bottom of the vent terminal s shall be located at least 5 ft 1 5 m above the air intake terminal s unless there is a minimum 5 ft 1 5 m horizontal separation between them Avoid terminal locations...

Страница 7: ...t and combustion air ter minals must be installed on the same plane outside wall in order to prevent pressure differences due to prevailing winds Incoldclimates double wallorinsulatedinletpipe recomme...

Страница 8: ...s Boiler Manual 8 Figure 3 Vertical Air Intake and Venting for a Direct Vent System Category IV Figure 4 Combination Direct Vent Systems Category IV 10 FT 3 1 m 4 FT 1 2 m 5 FT 1 5 m 1 5 FT 0 5 m 5 1...

Страница 9: ...y into a listed metal chimney system Figures 7 9 Thechimneymustprovideanegativepressurenotgreaterthan0 10 in 2 5 mm W C at the boiler water heater flue collar with the unit running The Futera III when...

Страница 10: ...at 3 ft 0 9 m intervals with overhead hangers Use a single wall stainless steel vent pipe the same diameter as the flue collar to connect the boiler water heater to a masonry chimney When using a list...

Страница 11: ...e 9 Vertical Venting Using a Lined Masonry Chimney Category II Figure 11 Multiple Outdoor Units Figure 8 Vertical Venting Using a Lined Masonry Chimney Category I Figure 10 Outdoor Venting Category IV...

Страница 12: ...nstall s et les autres espaces du b timent Mettre en marche les s cheuses tous les appareils non raccord s au syst me d vacuation commun et tous les ventilateurs d extraction comme les hottes de cuisi...

Страница 13: ...pe of valve between the boiler waterheaterandthereliefvalveoranexplosioncausing extensive property damage severe personal injury or death may occur Flow Switch The flow switch supplied with the boiler...

Страница 14: ...heater for proper wiring connections Expansion Tank Air Separator An expansion tank or other means to control thermal expansion must be installed in the heating system An expansion tank must be insta...

Страница 15: ...urn temperature 7 For HeatNet operation a sensor is required and installed at a minimum of 12 from primary loop tee supplied Notice These drawings show suggested piping configuration and valving Check...

Страница 16: ...rs furnished with factory mounted outlet water temperature gauge 4 Boiler pump purging required Use terminals supplied 5 Secondary loop pipe diameter must be sized large enough to handle maximum flow...

Страница 17: ...nd by maintaining the pH between 5 and 9 Follow the conditions listed under NORMAL in the table In some areas of the country additional precautions must be observed due to unusual charac teristics of...

Страница 18: ...Finned copper tube gas boilers water heaters Boiler Manual 18 Table 9 Futera III Heat Exchanger Selection Graph Table 10 Futera III Pumping Performance Requirement...

Страница 19: ...ed pump max pipe length 30 ft total 6 90 elbows full pipe size 5 CAUTION MEASURE WATER HARDNESS AND pH AT JOB SITE 6 The pH and water hardness must be measured before selecting heat exchanger and pump...

Страница 20: ...at the bottom of the vertical section of the gas supply pipe upstream of the gas controls A ground joint union should be installed between the boiler gas controls and the supply piping Each of these i...

Страница 21: ...s installed oudoors The wire size must be compatible with the total amp draw of the circuit Refer to the wiring diagram supplied with the boiler water heater for proper wiring connections and boiler f...

Страница 22: ...il a t plong dans l eau m me partiellement Faitesinspecterl appareilparuntecnicienqualifi et remplacez toute partie du syst me de contr le et toute com mande qui ont t plong s dans l eau Operating Ins...

Страница 23: ...Nat Gas Category II and IV Firing rate 500 750 1000 1250 1500 1750 2000 Signal Inches wc Signal Inches wc Signal Inches wc Signal Inches wc Signal Inches wc Signal Inches wc Signal Inches wc 100 2 2 4...

Страница 24: ...off all electric power to the boiler if service is to be performed 3 Close the manual main and pilot gas shut off valves COMMENT COUPER L ADMISSION DE GAZ DE L APAREIL 1 R glez le thermostat la temp...

Страница 25: ...when the boiler is firing at full rate Low gas pressure could indicate undersized gas line or insufficient gas supply Static and operating gas pressure required at the gas valve inlet is between 2 W...

Страница 26: ...Finned copper tube gas boilers water heaters Boiler Manual 26 RBI FIELD WIRING TO HEATNET BOARD Figure 22 RBI Field Wiring to HeatNet Board Board Revision 3 0 and greater...

Страница 27: ...n be used to control HeatNet equipped boilers Method 1 A 4 20mA signal can be used to directly modulate each boiler from a remote panel or building management system On multiple boiler installations t...

Страница 28: ...y will also list faults should the unit fail to operate An explanation of each status message and fault can be located in HeatNet Control Manual under status screen fault display section STATUS SCREEN...

Страница 29: ...ock is located on J11B SPARE 4 FAULT SYSTEM SET 160 F INTERLOCK SPARE 4 FLOW SWITCH ERROR Once the FIII series boiler receives a call for heat it closes the circulator pump relay It then waits 10 seco...

Страница 30: ...ET 160 F OPEN OUTSIDE SENSOR SHORTED SENSOR If the shorted sensor fault is displayed thesensorinthepositionreportedwasoriginallydetected but has since shorted The boiler will shut down on any SHORTED...

Страница 31: ...osits indicate condensation due to low return water temperatures In either case the heat exchanger must be cleaned thoroughly and the problem resolved before the boiler water heater is returned to ser...

Страница 32: ...qualified service technician to have it inspected NEVER try to clean or repair the relief valve If the valve fails to operate properly have it replaced 5 Theaquastathighlimitcontrolsthemaximumwaterte...

Страница 33: ...entify which interlock has tripped Reset the Interlock or check for disconnected wiring or shorts The Air Pressure from UV Sensor interlock if displayed will allow the boiler to function but it needs...

Страница 34: ...Finned copper tube gas boilers water heaters Boiler Manual 34 Figure 25 Exploded View REPAIR PARTS...

Страница 35: ...Finned copper tube gas boilers water heaters Boiler Manual 35 REPAIR PARTS CONTINUED RIOM 74 REV E...

Страница 36: ...4 2 2 2 2 2 2 2 19 Flange 1 Outlet 11 0228 1 1 1 1 Flange 1 1 2 Outlet 11 0229 1 1 1 NS Orifice Gasket 06 0022 1 1 1 1 1 1 1 NS Gas Injectors NG 10 1009 1 1 1 1 Gas Injectors NG 10 1002 1 1 1 Gas Inje...

Страница 37: ...1 1 1 1 Tridicator 75 160 psi 13 0305 1 1 1 1 1 1 1 46 Heat Exchanger Assembly Copper 70 2515 1R 1 Cast Iron prior to 0209 must replace 70 2516 1R 1 combustion chamber top panel 36 70 2517 1R 1 70 25...

Страница 38: ...2 2 2 NS 10K Temperature Sensor 14 0325 3 3 3 3 3 3 3 50 Transformer 50 VA 15 0007 1 1 1 1 1 1 1 51 Purge Timer ST7800 16 0007 1 1 1 1 1 1 1 52 Spark Generator Q652B 16 0036 1 1 1 1 1 1 1 53 Flame Saf...

Страница 39: ...0102 1 1 1 1 1 1 1 81 Pilot Orifice 052 NG 10 0140 1 1 1 1 1 1 1 Pilot Orifice 040 LP 10 0139 1 1 1 1 1 1 1 82 Mini Peeper C7027A 16 0009 1 1 1 1 1 1 1 83 Spark Plate Gasket 06 0102 1 1 1 06 0037 1 1...

Страница 40: ...he electrical panel Disable any external call for heat and toggle the remote local switch to REMOTE 1 Toggle the LOW FIRE switch to cycle the boiler then hold at trial for pilot ignition 2 Set pressur...

Страница 41: ...TWEEN THE HEATER INLET AND OUTLET IS CRITICAL TO PROPER FLOW BEFORE YOU LEAVE THE JOBSITE YOU MUST RECORD THE DELTA T THIS READING SHOULD NOT EXCEED 35 F 19 4 C NOR BE LOWER THAN 20 F 11 2 C DELTA T C...

Страница 42: ...the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS g INSP...

Страница 43: ...ubes caused by high water velocity through the tubes and is not covered by the manufacturer s warranty See Installation Instructions for proper pump performance Chemical corrosion no corrosive chemica...

Страница 44: ...right 2014 Mestek Inc 260 North Elm Street 7555 Tranmere Drive Westfield MA 01085 Mississauga Ontario L5S 1L4 Canada Phone 413 568 9571 Phone 905 670 5888 Fax 413 568 9613 Fax 905 670 5782 www rbiwate...

Отзывы: