INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY | MELBOURNE | BRISBANE | PERTH | AUCKLAND
Australia
1300 788 778 www.rba.com.au |
New Zealand
0800 722 111 www.rbagroup.co.nz
11 of 20
2.2 Installing The Controller
• Mount controller on wall so piezo wire can easily
reach unit.
• Make electrical connections: Connect wires of
• Half Flush
piezo to the
GND
and
SIG
terminals
• of Sensor A. Connect wires of
Full Flush
piezo to
• the
GND
and
SIG
terminals of
Sensor B.
Connect
• Solenoid valve to
Valve A
. Connect the Power
• Pack to
Power 24VAC
, + and
N
terminals
• Din-plug wiring connection has been completed
in house to allow for batch test release. The unit
is low voltage, 24VAC, so polarity is not critical.
Ensure cable is wired to neutral and active
terminals.