![Raytheon Anschütz 130-626 Скачать руководство пользователя страница 45](http://html.mh-extra.com/html/raytheon-anschutz/130-626/130-626_operators-and-service-manual_791405045.webp)
2-3
Settling Stage
During the settling stage the gyro heading may be used to a certain extent.
The gyro system is settled after a period of 4 hours (for Raytheon Anschütz Standard 22).
Until then the heading information has a reduced accuracy.
The settling stage is displayed below the heading information (see Figure 2-2).
If a second gyro is connected, the settling stage is indicated with “(settling)” next to
heading information of the unselected gyro.
Figure 2-2
Settling Stage
Содержание 130-626
Страница 70: ......
Страница 100: ...Operator Unit 130 626 NG002 Standard 22 GYRO COMPASS 4352 DOC010002 6 2 Edition February 2020 Intentionally left blank ...
Страница 102: ......
Страница 103: ......
Страница 104: ......