OPERATION INSTRUCTIONS
6 – 0
WARNINGS!
BEFORE OPERATING THIS OR ANY OTHER TEST EQUIPMENT
READ ALL SAFETY
WARNINGS AND UNDERSTAND THEM FULLY.
TR-1 & TR-1P Operating Instructions:
If you are new to transformer turns ratio testing, please review the entire
manual carefully before operating this equipment. If you have any
questions please do not hesitate to contact your nearest representative or
Raytech Switzerland.
All selections and data input are accomplished through the front panel
Digipot.
WARNING: Do not push on screen.
Step by step Instructions:
Open the case. Connect the measuring leads to the front panel black
connector (TwistLock).
Connect the test lead clips to the proper terminals of a transformer.
The “H” leads are always connected to the highest number of turns on all
transformers and the “X” Leads are always connected to the lowest
number of turns. The TR-1 & TR-1P is a very clever system and will
always check to make sure that this is done correctly.
Note:
The Ratiometer will not operate until connected to a transformer.
The word "
GO
" will appear when the leads are attached to a transformer.
All rights reserved. No portion may be reproduced without written consent
9
RAYTECH Switzerland