Preliminary
I.2
Arbitration
All disputes arising out of or in connection with the contract between the purchaser and Raytech
AG Switzerland and including those regarding the legal validity of this contract and this arbitration
clause shall be settled out of court and shall be referred to arbitration for final decision.
Any disputes between the purchaser and Raytech AG Switzerland shall be settled according to the
rules of settlement and arbitration of the chamber of commerce in Zurich by one or more arbitrators
appointed also according to the rules of arbitration of the chamber of commerce in Zurich
Switzerland.
90315-1.2 Instruction Manual CAPO
Page 115 of 117
INFO:
INFO:
NO OTHER WARRANTY IS EXPRESSED OR IMPLIED.
Содержание CAPO 2.5
Страница 37: ...Preliminary 4 Thermal Printer 90315 1 2 Instruction Manual CAPO Page 37 of 117 ...
Страница 96: ...Appendix Page 96 of 117 CAPO 2 5 CAPO 12 90315 1 2 Instruction Manual CAPO CAPACITANCE AND POWER FACTOR METER ...
Страница 113: ...Preliminary I Warranty Conditions 90315 1 2 Instruction Manual CAPO Page 113 of 117 ...
Страница 117: ...Preliminary K Index Page 117 of 117 90315 1 2 Instruction Manual CAPO ...