Raypak XFYRE 500 Скачать руководство пользователя страница 6

6

direct spark igniter and sensor for damage, crack-
ing or debris build-up.

7. Check operation of safety devices. Refer to manu-

facturers’ instructions.

8. Follow  oil-lubricating  instructions  on  pump  (if  re-

quired).  Over-oiling  will  damage  pump.
Water-lubricated circulators do not need oiling.

9. To avoid potential of severe burn, DO NOT REST

HANDS ON OR GRASP PIPES. Use a light touch;
return piping will heat up quickly.

10. Check blower and blower motor

11. Check for piping leaks around pumps, relief valves

and  other  fittings.  Repair,  if  found.  DO  NOT  use
petroleum-based stop-leak.

Periodically

1. Check  relief  valve.  Refer  to  manufacturer’s

instructions on valve.

2. Test low water cut-off (if equipped). Refer to manu-

facturer’s instructions.

Preventive Maintenance

Schedule

The  following  procedures  are  recommended  and  are
good practice for all XFyre installations.

Daily

1. Check gauges, monitors and indicators.

2. Check  instrument  and  equipment  settings.  (See

“Post Start-Up Check” in the I&O Manual.)

3. Check burner flame. (Should see light blue flame

at full input rate).

Weekly

For  low-pressure  heaters,  test  low-water  cut-off
device.  (With  heater  in  pre-purge,  depress  the  low
water  cut-off  test  button.    Appliance  should  shut-off
and ignition fault light should come on. Depress reset
button on front of heater control panel to reset).

Daily

1. Check that the area where the heater is installed

is  free  from  combustible  materials,  gasoline,  and
other flammable vapors and liquids.

2. Check for and remove any obstruction to the flow

of combustion or ventilation air to heater.

Monthly

1. Check  for  piping  leaks  around  pumps,  mixing

valves,  relief  valves,  and  other  fittings.  If  found,
repair  at  once.  DO  NOT  use  petroleum-based
stop-leak compounds.

2. Visually inspect burner flame.

3. Visually  inspect  venting  system  for  proper  func-

tion, deterioration or leakage.

4. Visually  inspect  for  proper  operation  of  the  con-

densate  drains  in  the  venting,  and  the  internal
condensate trap. Clean trap as necessary. If leaks
are observed, repair at once.

5. Check air vents for leakage.

Yearly (Beginning Of Each Heating 

Season)

Schedule  annual  service  call  by  qualified  service
agency.

1. Visually  check  top  of  vent  for  soot.  Call  service

person to clean. Some sediment at bottom of vent
is normal.

2. Visually  inspect  venting  system  for  proper  func-

tion,  deterioration  or  leakage.  Ensure  that
condensate  drain  is  inspected  and  ensure  that
condensate  is  being  directed  to  appropriate  con-
densate management system or drain, as required
by local codes.

3. Check  that  area  is  free  from  combustible  materi-

als,  gasoline,  and  other  flammable  vapors  and
liquids.

4. Check for and remove any obstruction to the flow

of combustion or ventilation air to heater.

5. Follow pre-start-up check in the Start-up section.

6. Visually  inspect  burner  flame.  It  should  be  light

blue  at  full  input.  Remove  and  visually  inspect

Содержание XFYRE 500

Страница 1: ...or explosion may result causing property damage personal injury or loss of life QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ Ne pas tenter d allumer d appareils Ne touchez aucun interrupteur Ne pas vous...

Страница 2: ...defects or other reproductive harm WARNING Risk of electrical shock More than one disconnect switch may be required to de energize the equipment before servicing CAUTION This boiler requires forced w...

Страница 3: ...3...

Страница 4: ...ONS DE MISE EN MARCHE 1 ARR TEZ Lisez les instructions de s curit sur la portion sup rieure de cette tiquette 2 R glez le thermostat la temp rature la plus basse 3 Coupez l alimentation lectrique de l...

Страница 5: ...ice agency and maintenance must be performed to ensure maximum operating efficiency Maintenance as outlined below may be performed by the owner Fig 1 Component Locations Sides Fig 2 Component Location...

Страница 6: ...Check that the area where the heater is installed is free from combustible materials gasoline and other flammable vapors and liquids 2 Check for and remove any obstruction to the flow of combustion or...

Страница 7: ...ns Before beginning this procedure you must have on hand the following items a nylon stainless steel or brass brush not steel Rydlyme recommended for best results or CLR Gloves eye protection 1 Shut d...

Страница 8: ...s 3 Check flame failure detection system See Post Start Up Check in the I O Manual Verify high and low fire flame signal compare to start up data 4 Check igniter Clean and verify spark gap see Fig 36...

Отзывы: