background image

16

shipped loose. The full open position is appropriate for

most systems, and ensures adequate flow through the

boiler.

If system flow is inadequate, (indicated by excessive

temperature drop through the system) the bypass

valve can be throttled slightly. Care must be taken

against over-throttling which may lead to inadequate

flow through the boiler and boiler harmonics (a hum-

ming sound from the heat exchanger).

If adequate system flow cannot be obtained without

causing harmonics, an additional pump is required.

The factory-mounted circulator will provide adequate

water flow for systems designed at a 20°F temperature

drop, and system pressure drop or head not exceed-

ing that which is shown in Table J.

When the total system head exceeds the available

head pressures, a primary/secondary pumping system

is recommended.

The minimum boiler operating temperature should be

105°F. When operating at low temperature applica-

tions, ∆T (temperature rise) must be 20°F or less.

Propylene glycol solution is commonly used in the

heating system when freeze protection is required.

This will affect the system design and pump perform-

ance. As a rule of thumb, 50% solution of propylene

glycol will require the system flow (gpm) to increase by

14%, and the system head (ft/WC) by 23% in order to

maintain the same heat transfer load.

Model No.

System Flow

(gpm)

Max. System

Head (ft/WC)

H-0042

3.5

8.0

H-0066

5.3

8.5

H-0090

7.3

6.5

H-0135

11.0

10.0

H-0180

14.6

7.0

Table J: System Pressure Drop

Systems with multiple zones may require an addition-

al circulator. Consult manufacturer's data for valve

pressure drops. When an indirect water heating sys-

tem is used, it is recommended that a separate

circulator be installed to meet the required flow and

pressure drop conditions of the indirect water heater.

We recommend that the make-up water from the cold

water line have a check valve, gate valve, and feedwa-

ter regulator set at 12 psi. Install unions and gate or

ball valves at inlet and outlet connections at the boiler

to facilitate servicing.

The pressure relief valve is mounted on the boiler and

must be piped to a drain. We recommend that all high

points be vented and that purge valves be installed. A

boiler installed above radiation level must be provided

with a low water cut-off device. See page 27 for wiring

hook-up.

The boiler, when used in connection with a refrigera-

tion system, must be installed so that the chilled

medium is piped in parallel with the boiler with appro-

priate valves to prevent the chilled medium from

entering the boiler.

The boiler piping system of a hot water heating boiler,

that is connected to heating coils located in air han-

dling units where they may be exposed to refrigerated

air circulation, must be equipped with flow control

valves or other automatic means to prevent gravity cir-

culation of the boiler water during the cooling cycle.

A diaphragm expansion tank should be installed in the

return line. A typical 8"-diameter expansion tank can

be used on models H-0042, and H-0066, and an 11"-

diameter expansion tank can be used on models

H-0090, H-0135 and H-0180. Consult tank manufac-

turer for correct sizing.

Содержание RAYTHERM 0042B

Страница 1: ...in an explosion or fire WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a...

Страница 2: ...2 Rev 29 reflects the following Changes to Note on Page 8 text on Page 10 Item 7 on Page 11 mounting instructions on Page 12...

Страница 3: ...Lighting the Boiler 27 For Standing Pilot Models 27 Filling the System 27 Checking the Circulator 27 For Standing Pilot Models with Robertshaw Gas Valve 2 stage Operation Models 90 13 180 28 To Turn...

Страница 4: ...earch on Cancer IARC has classified the inhalation of crystalline silica cristabolite as carcinogenic to humans When removing the burners or heat exchangers take precautions to avoid creating airborne...

Страница 5: ...ican National Standard ANSI Z21 13 CSA 4 9 Each boiler has been constructed and pressure tested in accordance with the requirements of Section IV of the American Society of Mechanical Engineers Code a...

Страница 6: ...del No Input MBH Heating Capacity MBH Net I B R Rating Piping Connections A B C K Vent Dia Water NPT Gas NPT H 0042 42 35 30 1 in 1 2 in 11 in 5 3 4 in 5 1 2 in 4 in H 0066 66 54 47 1 in 1 2 in 11 in...

Страница 7: ...addition the boiler shall be installed such that the gas ignition system components are protected from water dripping spraying rain etc during appliance operation and service circulator replacement c...

Страница 8: ...s found in refrigerants aerosol propellants drycleaning fluids degreasers and paint removers Other harmful elements may come from bleaches air fresheners or mastics Vapors from these types of products...

Страница 9: ...must terminate with a listed vent cap which complies with the local codes or in the absence of such codes to the latest edition of the National Fuel Gas Code ANSI Z223 1 The discharge opening must be...

Страница 10: ...e Venting of Equipment section of the National Fuel Gas Code ANSI Z223 1 or applicable provisions of the local building codes Common Vents Manifolds that connect more than one boiler to a com mon chim...

Страница 11: ...s been determined that each appliance remaining connected to the common venting sys tem properly vents when tested as outlined above return doors windows exhaust fans fireplace dampers and any other g...

Страница 12: ...amper on a continuous pilot system as this will create a haz ardous condition Fig 9 Installing The Vent Damper in Horizontal Vertical Vents Fig 10 D80D General Wiring Diagram Install the vent damper t...

Страница 13: ...er main burners are operating Flair Damper NOTE To place vent damper in the open position to allow burner operation Turn the power off Turn the damper blade to fully open position arrow facing same di...

Страница 14: ...14 VENT DAMPER...

Страница 15: ...VALVE OVER PRESSURED GAS VALVES ARE NOT COVERED BY WARRANTY The boiler and its gas connections shall be leak tested before placing the appliance in operation Use soapy water for leak test DO NOT use...

Страница 16: ...op Systems with multiple zones may require an addition al circulator Consult manufacturer s data for valve pressure drops When an indirect water heating sys tem is used it is recommended that a separa...

Страница 17: ...elief Valve to Drain Cold Water Inlet Heating Units Fig 15 Single Zone Piping Air Scoop Air Vent Diaphragm Expansion Tank Feed Valve Pipe Pressure Relief Valve to Drain Cold Water Inlet Heating Units...

Страница 18: ...rols drawing on page 28 The pump is supplied and factory wired to operate with the boiler The TH wire leads are for the room thermostat or zone valve connections The room thermostat should be installe...

Страница 19: ...19 Wiring Diagrams...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...17 Single Zone Taco Valve Fig 18 Dual Zone Taco Valve Fig 19 Dual Zone Honeywell Valve NOTE Maximum three 3 zone valves per one 1 40 VA transformer NOTE Maximum five 5 zone valves per one 1 40 VA Tran...

Страница 23: ...23 Fig 20 System with Three 3 Zone Pumps NOTE Check VA rating of each relay coil Total load must not exceed VA rating of transformer Fig 21 Power Vent System with Zone Valve...

Страница 24: ...24 Fig 22 Primary Secondary Pumping System Honeywell Zone Valve Fig 23 Standing Pilot with Low Water Cut off Device Note Low water cut off LWCO and system switch supplied by others...

Страница 25: ...25 Fig 24 IID Units with Low Water Cut off Device Note Low water cut off LWCO and system switch supplied by others...

Страница 26: ...t main valve pilot At the same time the electronic spark genera tor in the module produces a high voltage spark output that lights the pilot burner If the pilot burner does not light the module will n...

Страница 27: ...ace any part of the control system and any gas control which has been under water Filling the System Flush system before putting into operation to ensure that foreign material does not damage pump sea...

Страница 28: ...e lowest setting 3 Turn off all electrical power to the boiler 4 Push in and move gas control lever counter clockwise to OFF position GAS CONTROL LEVER SHOWN IN OFF POSITION GAS INLET 5 Wait five 5 mi...

Страница 29: ...information on the label affixed to the front of the unit If you don t smell gas go to the next step 7 For Honeywell valve turn gas control counter clockwise to On For Robertshaw valve Move gas contr...

Страница 30: ...er clock wise using the same number of turns as in step b Pilot Adjustment Fig 32 Robertshaw 7200 Gas Valve Models 90 135 180 e Replace pilot adjustment cover screw then follow the lighting instructio...

Страница 31: ...dle 8 Clean room air intake openings to ensure ade quate flow of combustion and ventilation air 9 Keep boiler area clear and free from combustible materials gasoline and other flammable vapors and liq...

Страница 32: ...AIR PROCEDURES Tube Cleaning Procedure Typical Establish a regular inspection schedule the frequency of which depends on the local water condition and severity of service Do not let the tubes clog up...

Страница 33: ...hould be replaced with new ones 2 Install in out and return water headers and install header retainer nuts and torque nuts evenly 3 Replace V baffles 4 Install thermostat sensing bulbs in header wells...

Страница 34: ...wiring circuit Replace thermostat or repair wiring connections 3 Check secondary voltage If no 24V replace transformer 4 Check relay coil or contacts Replace as required 5 Replace pump 1 Light pilot b...

Страница 35: ...ean gas line or increase gas line piping 1 Refer to installation instructions re garding combustion air require ments 2 Refer to installations instructions 3 See yellow flame section above 10 Defectiv...

Страница 36: ...placement 1 Shut off electrical power to the boiler 2 Remove wiring connections to switch 3 Remove screws 2 holding the switch 4 Reverse above procedure to re install Vent Thermal Switch Replacement 1...

Страница 37: ...he above procedure to re install Use new gaskets and make sure they are seated prop erly when tightening the nuts and bolts CAUTION To avoid damage to electrical components keep water from getting int...

Страница 38: ...conditions satisfied The replacement part will be warranted for only the unexpired portion of the original warranty Raypak makes no warranty whatsoever on parts manufactured by others but Raypak will...

Страница 39: ...39...

Страница 40: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...

Отзывы: