background image

32

Vertical Direct Vent System
Installation

These installations utilize the heater mounted blower
to draw combustion air from outdoors and uses the
natural buoyancy of the heated flue products to create
a thermal driving head that expels the exhaust gases
from the flue. The negative draft must be within the
range of -0.01 to -0.08 in. WC as measured 12 in. from
the appliance outlet to ensure proper operation. The
vent material must be in accordance with the above
instructions for vent materials. Vent material must be
listed by a nationally recognized test agency.

The maximum and minimum venting length for
Category I appliance shall be determined per the lat-
est edition of the NFGC (U.S.) and B149 Installation
Code (Canada).

The connection from the appliance exhaust vent to the
stack must be as direct as possible and should be the
same as or larger than the vent outlet. The vent must
be installed to prevent accumulation of condensate
and, where necessary, have means provided for
drainage of condensate. The horizontal breaching of a
vent must have an upward slope of not less than 1/4
inch per linear foot from the heater to the vent termi-
nal. The horizontal portions of the vent shall also be
supported for the design and weight of the material
employed to maintain clearances and to prevent phys-
ical damage or separation of joints.

Vertical Direct Vent Termination

The exhaust vent terminal should be vertical and
should terminate outside the building at least two (2)
feet above the highest point of the roof within 10 feet.
The vent cap should have a minimum clearance of
four (4) feet horizontally from and in no case above or
below (unless a four (4) foot horizontal distance is
maintained) electric meters, gas meters, regulators
and relief equipment. The distance of the vent terminal
from adjacent public walkways, adjacent buildings,
open windows and building openings must be consis-
tent with the NFGC, or in Canada, the B149.
Installation Code. Gas vents supported only by flash-
ing and extended above the roof more than five feet
should be securely guyed or braced to withstand snow
and wind loads.

The vertical direct vent cap is designed for roof top
mounting only. The air inlet opening MUST be installed
one (1) foot above the roof line or above normal snow
levels that might obstruct combustion air flow. This
dimension is critical to the correct operation of the
heater and venting system and reduces the chance of

blockage from snow. The vent cap must have a mini-
mum 3 foot clearance from the air inlet opening.

Outdoor Installation

Outdoor models are self-venting when installed with
the factory-supplied restricted direct vent cap and
require no additional vent piping. This special vent cap
is provided with the heater in accordance with CSA
requirements. It must be installed directly on the
heater. See Section B for correct clearances.

Care must be taken when locating the outdoor unit
because the flue gases discharged from the vent hood
can condense as they leave the hood. Improper loca-
tion can result in damage to adjacent structures or
building finish. For maximum efficiency and safety, the
following precautions must be observed:

a)  Outdoor models must be installed outdoors and

must use the outdoor vent hood supplied by the
manufacturer.

b)  Periodically check venting system. The heater’s

venting areas must never be obstructed in any
way and minimum clearances must be observed
to prevent restriction of combustion and ventilation
air. Keep area clear and free of combustible and
flammable materials.

c)  Do not locate adjacent to any window, door walk-

way, or gravity air intake. The vent must be located
a minimum of four (4) feet horizontally, or four (4)
feet below, or one (1) foot above such areas.

d)  Install above grade level and above normal snow

levels.

e)  Vent terminal must be at least 3 feet above any

forced air inlet located within 10 feet.

f)  Adjacent brick or masonry surfaces must be pro-

tected with a rust-resistant sheet metal plate.

g)  Multiple Outdoor Vent installations require a four

(4) feet clearance between vent caps.

The restricted vent cap must be furnished by the
heater manufacturer in accordance with its listing.

An outdoor air filter, supplied by the manufacturer is
mounted on the heater.

NOTE:

Condensate can freeze on the vent cap.

Frozen condensate on the vent cap can result in a
blocked flue condition.

Содержание HI DELTA 122-322

Страница 1: ...To do so may result in an explosion or fire WHAT TO DO IF YOU SMELL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your...

Страница 2: ...The text in the BEFORE INSTALLATION section on page 5 the text in paragraph one of the GENERAL SAFETY section on page 8 the text in paragraph one of the Outdoor Installations section on page 10 Table...

Страница 3: ...ions 19 Venting 21 Outdoor Installation 32 High Limit Manual Reset 33 Flow Switch 33 CONTROLS 33 Ignition Control Module 33 Low Water Cut Off Optional 34 Operating Control 34 WIRING DIAGRAM MODELS 122...

Страница 4: ...required to deenergize the equipment before servicing CAUTION Operation of this heater in low temperature systems requires special piping Harmful internal condensation will occur if the inlet water t...

Страница 5: ...er the manufacturer s warranty Debits for defec tive replacement parts will not be accepted Parts will be replaced in kind only per Raypak s standard war ranties Model Identification The model identif...

Страница 6: ...GAS CONNECTION VIEW PORT PRESSURE RELIEF CONNECTION FLUE EXHAUST COMBUSTION AIR INTAKE Component Locations Fig 1 Component Locations Back Fig 2 Component Locations Left Side Panels removed for clarity...

Страница 7: ...ntake 122 3 2 1 4 5 162 4 2 1 5 5 202 5 2 1 5 5 242 6 2 1 5 5 322 8 2 1 6 5 Model No Burners per Valve Stages Fire at Stage A B 1 2 1 2 122 2 1 A AB 66 100 162 3 1 A AB 75 100 202 3 2 A AB 60 100 242...

Страница 8: ...mometer in the hot water stream and read the thermometer NOTE When this water heater is supplying general purpose hot water for use by individuals a thermostatically controlled mixing valve for reduci...

Страница 9: ...he heater should be mounted on a level structurally sound surface The heater is approved for installation on a combustible surface but must NEVER be installed on carpeting Gas fueled equipment install...

Страница 10: ...tray In either case the heater must be installed in a manner that will enable the heater to be serviced without removing any structure around the heater Heater Side Min Clearance from Combustible Surf...

Страница 11: ...quipment in the enclosure b Where communicating with the outdoors through horizontal ducts each opening shall have a minimum free area of 1 sq in per 2000 Combustion and Ventilation Air Indoor Units T...

Страница 12: ...and there is no draft regulator drafthood or similar flue gas dilution device installed in the same space in addition to the opening for ventilation air required in 1 there shall be a permanent air s...

Страница 13: ...1 0 40 44 11 8 9 322 27 4 70 18 2 2 14 1 4 40 44 12 2 12 Table F Heater Rates of Flow and Pressure Drops Flow switch when used will not activate at less than 12 gpm NOTE Basis for minimum flow 10 gpm...

Страница 14: ...14 Fig 9 Single Boiler Low Temperature Application Heat Pump Primary Secondary Piping Fig 10 Dual Boiler Primary Secondary Piping...

Страница 15: ...rovided with a low water cut off device The boiler when used in connec tion with a refrigeration system must be installed so the chilled medium is piped in parallel with the boiler with appropriate va...

Страница 16: ...16 Fig 11 Single Heater Domestic Hot Water with One Storage Tank...

Страница 17: ...pletely dilut ed into the pool or spa water before being circulated through the heater Do not place chlorine tablets or bromine sticks in the skimmer High chemical concen trations will result when the...

Страница 18: ...3 5 0 1 in WC for natural gas and 10 5 in 0 1 in WC for propane gas If an adjustment is needed turn the adjustment screw clockwise to increase pressure or counter clockwise to decrease pressure CAUTIO...

Страница 19: ...re as supplied with the heater must be replaced it must be replaced with 105 C wire or its equivalent Check the Power Source AC 108 Volts AC Minimum 132 Volts AC MAX AB 108 Volts AC Minimum 132 Volts...

Страница 20: ...ol at the setpoint in which you want the heater to maintain Ensure that the sens ing bulb of the control is at the point in the system that will best maintain the temperature you want For example when...

Страница 21: ...ids excessive condensate pro duction in the vent Category II A heater which operates with a non posi tive vent static pressure and with a vent gas temperature that may cause excessive condensate produ...

Страница 22: ...s for proper opera tion Support of Vent Stack The weight of the vent stack or chimney must not rest on the heater vent connection Support must be pro vided in compliance with applicable codes The vent...

Страница 23: ...e 4 ft 1 2m below or to side of opening 1 ft 30 cm above opening 3 ft 91 cm K Clearance to mechanical air supply inlet 3 ft 91 cm above if within 10 ft 3m horizontally 6 ft 1 83m L Clearance above pav...

Страница 24: ...bove or below unless four 4 feet horizontal distance is maintained from elec tric meters gas meters regulators and relief equipment e Terminate vent at least six 6 feet away from adja cent walls f DO...

Страница 25: ...l be in accordance with the section on Venting of Equipment of the latest edition of NFGC or in Canada B149 Installation Code for Gas Burning Appliances and Equipment or applicable pro visions of loca...

Страница 26: ...e B149 Installation Code for Gas Burning Appliances and Equipment Gas vents supported only by flashing and extended above the roof more than five feet should be securely guyed or braced to withstand s...

Страница 27: ...TION AIR FILTER BOILER UNIT Fig 19 Horizontal Thru Wall Venting Category III g Any improper operation of the common venting system should be corrected so that the installation conforms with the latest...

Страница 28: ...n of condensate in the vent pipes It is rec ommended that a The vent be installed with a slight downward slope of not more than 1 4 per foot of horizontal run to the vent terminal b The vent be insula...

Страница 29: ...ce Category Certified Venting Material Vent Size inches Max Venting Length feet Combustion Air Intake Pipe Material Air Inlet Size inches Max Air Intake Length feet 122 III Stainless Steel Gas Tight 4...

Страница 30: ...rminal In this case an approved conden sate trap must be installed per applicable codes b The vent be insulated through the length of the horizontal run Horizontal Thru wall Direct Vent Termination Th...

Страница 31: ...l Vent Size inches Min Max Vertical Venting Height feet Combustion Air Intake Pipe Material Air Inlet Size inches Max Air Intake Length feet 122 I Type B Equivalent 4 5 25 Galvanized Steel PVC ABS CPV...

Страница 32: ...d to withstand snow and wind loads The vertical direct vent cap is designed for roof top mounting only The air inlet opening MUST be installed one 1 foot above the roof line or above normal snow level...

Страница 33: ...eater is equipped with a manual reset high limit temperature device Push the reset button and adjust the setting to 30 F or 40 F above desired operating temperature WARNING Installation adjustment and...

Страница 34: ...emporary conditions such as power fluctuations or air pockets Fig 24 Flow Switch Fig 25 Low Water Cut Off Flow Switch Dual purpose control shuts off heater in case of pump failure or low water flow Mo...

Страница 35: ...35 WIRING DIAGRAM MODELS 122 322...

Страница 36: ...neigh bor s telephone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department 4 Use only your hand to push in or turn the gas con trol knob Never use tool...

Страница 37: ...o original position Main Burner Adjustment 1 Turn off unit 2 Open manual firing valve 3 Turn on the unit wait 15 seconds and the igniter should glow Sight glass to check igniter at both ends of the he...

Страница 38: ...e Turn on manual gas valve Turn power on Set thermostat to call for heat When the unit is in operation Disconnect combus tion air blower pressure switch burner should go off immediately Wait 5 minutes...

Страница 39: ...ay be performed by the owner Yearly Beginning of each heating season 1 Annual service call by qualified service agency 2 Visually check top of vent for soot Call service person to clean Some sediment...

Страница 40: ...g contaminants listed below which will induce acidic condensation you want to reduce infiltration into your building through openings around windows and doors you are using AL29 4C stainless steel ven...

Страница 41: ...all applicable warranty conditions found satisfied The replacement part will be warranted for only the unexpired portion of the original warranty Raypak makes no warranty whatsoever on parts not manuf...

Страница 42: ...42...

Страница 43: ...43...

Страница 44: ...www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...

Отзывы: