Project Name / Date 

 

Division 23 52 33.13 - 4

 

powder coat which is suitable for outdoor installation, applied prior to assembly for complete 
coverage, and shall incorporate louvers in the outer panels to divert air past heated surfaces. 

2.  The boiler(s), if located on a combustible floor, shall not require a separate combustible floor 

base. 

3.  The boiler(s) shall have the option of venting the flue products either through the top or the 

back of the unit. 

4.  Combustion air intake shall be on the left side of the cabinet, right side optional. 

L.  Boiler Operating Controls 

1.  The boiler(s) shall feature an optional four-stage digital controller with adjustable outdoor 

reset, mounted and wired. 

2.  Water and air temperature sensors shall be shipped loose for field installation by installing 

contractor. 

Specifier Note: The remaining items in this section are options. Delete those that are not being 

specified. 

IMPORTANT:

 The Cold Water Start and Cold Water Run Systems cannot be 

used on the same boiler. The Low Gas Supply Pressure and FlexGas Manifolds also 
cannot be used on the same boiler. 

M.  Boiler Pump - Refer to Equipment Schedule 
N.  SureRack™ Boiler Stacking Kit 

1.  The boilers shall be stacked directly one on top of the other, without offset, to minimize 

footprint. 

O.  Cold Water Start System 

1.  The boiler(s) shall be configured with a cold water start automatic proportional bypass system 

that ensures the boiler will experience inlet temperatures in excess of 120ºF in less than 7 
minutes to avoid damaging condensation. The unit will automatically shut down if the inlet 
temperature is not achieved within the 7 minute time frame. 

2.  The cold water start system shall be configured with a modulating three-way valve that is 

controlled by a system-matched PID controller. The PID controller temperature sensor shall be 
located in the inlet header of the boiler. 

3.  The control shall have a temperature setting dial located on the face of the board. The 

temperature range of the dial shall be 105ºF to 120ºF. The PID Logic shall be capable of 
limiting system overshoot to a maximum of 10ºF on initial start-up or call-for-heat. 

4.  The cold water start system shall be completely wired and mounted at the factory. 
5.  The control shall have the following diagnostic LED’s: 

a.  Call for heat 
b. Start-up mode 
c.  Inlet temperature error 
d.  Sensor out of range 

6.  The controller shall have alarm contacts. 

P.  Cold Water Run System 

1.  The boiler(s) shall be configured with a cold water run automatic proportional bypass system 

that ensures the boiler will experience inlet temperatures in excess of 120ºF in less than 7 
minutes to avoid damaging condensation. The unit will automatically shut down if the inlet 
temperature is not achieved within the 7 minute time frame. 

2.  The cold water run system shall be configured with a variable speed pump that is controlled by 

a system-matched PID control that injects the correct amount of cold water directly into the 
boiler loop to maintain a minimum inlet temperature. The PID controller temperature sensor 
shall be located in the inlet header of the boiler. 

3.  The control shall have a temperature setting dial located on the face of the board. The 

temperature range of the dial shall be 105ºF to 120ºF. The PID Logic shall be capable of 
limiting system overshoot to a maximum of 10ºF on initial start-up or call-for-heat. 

4.  The cold water start system shall be completely wired and mounted at the factory. 
5.  The control shall have the following diagnostic LED’s: 

a.  Call for heat 
b. Start-up mode 

Содержание 2342BE

Страница 1: ... ASME CSD 1 2009 when required 1 3 SUBMITTALS A Product data sheet including dimensions rated capacities shipping weights accessories B Wiring diagram C Warranty information D Installation and operating instructions 1 4 QUALITY ASSURANCE A Regulatory Requirements 1 ANSI Z21 13 CSA 4 9 2 Local and national air quality regulations for low NOx 20 PPM NOx emissions boilers B Certifications 1 CSA 2 ASM...

Страница 2: ...be designed to accommodate field changes of either left or right hand plumbing and electrical while leaving the tube bundle in place C Burners 1 The tubular burners shall have multiport radial gas orifices punched ports and slots be capable of quiet ignition and extinction without flashback at the orifice and be manufactured from corrosion resistant titanium stabilized stainless steel with low exp...

Страница 3: ... j Air pressure k Factory option l External interlock m Cold Water Start Cold Water Run optional n Ignition lock out 3 A Central Point Wiring board with diagnostic LED s indicating the status of each relay 4 Provide ignition module indicating the following flash codes by LED signal and displayed on LCD display a 1 flash low air pressure b 2 flashes flame in the combustion chamber w o CFH c 3 flash...

Страница 4: ...all be configured with a modulating three way valve that is controlled by a system matched PID controller The PID controller temperature sensor shall be located in the inlet header of the boiler 3 The control shall have a temperature setting dial located on the face of the board The temperature range of the dial shall be 105ºF to 120ºF The PID Logic shall be capable of limiting system overshoot to...

Страница 5: ...es laws regulations and ordinances 2 National Fuel Gas Code ANSI Z223 1 NFPA 54 latest edition 3 National Electrical Code ANSI NFPA 70 latest edition 4 Standard for Controls and Safety Devices for Automatically Fired Boilers ANSI ASME CSD 1 when required 5 Canada only CAN CSA B149 Installation Code and CSA C22 1 CEC Part I 6 Manufacturer s installation instructions including required service clear...