3. INSTALLATION REQUIREMENTS

The equipment must be installed in accordance with local codes, or in the absence of local codes with the

latest edition of the National Fuel Gas Code, 

ANSI Z223.1, 

 the National Electrical Code, 

ANSI/NFPA 70.

The equipment shall be installed in accordance with those installation regulations in force in the local area where
the installation is to be made.  These shall be carefully followed in all cases.  Authorities having jurisdiction shall
be consulted before installations are made.

MOUNTING POWER VENT ASSEMBLY

Follow these instructions if the PowerVent venting system was purchased as an option
assembly kit.

1. Remove existing pagoda top (outdoor units) or drafthood (indoor units).  To remove the

pagoda top, push the four brackets inward and pull up the pagoda top.  The pagoda may
then be discarded.

2. Unscrew the four screws holding the outer top using a phillips screw driver. Remove the

jacket top.

3. Replace the inner stack adapter.  If the heater had a drafthood installed previously, re-

move the inner stack adapter and replace it with the PowerVent stack adapter.  Otherwise,
install the PowerVent stack adapter.

4. Unscrew the access panel on the right side of the appliance.  Set aside the screws with

the access panel.

5. Remove the knurled screw holding the front door and set it aside with the door.
6. Mount the jacket top above the unit.  Note: Do not install at this point.
7. Mount the Power Vent on the outer top.
8. Route the conduit harness of the PowerVent thru the outer top hole, around the adapter

towards the back of the unit.  Continue routing the harness thru the corner slot, which
leads to open area behind the access panel.  Finally, route only the wire harness thru the
7/8” grommet hole located on the sway brace.  Follow instructions on page 7 to wire the
PowerVent.  Note:  Newer units have a 7/8” grommet located on the rain shield, which
would eliminate routing the harness around the back corner.

9. Re-mount the jacket top to its original position and screw in the four screws holding it

down to the appliance.

10. If the appliance is a 181, 182, 330 or 331, remove the tabs underneath the power vent

using a 5/16” nut driver and relocate the closer to the center of the Power Vent.

Fig #9372

Содержание 185

Страница 1: ...n service or maintenance can cause property damage personal injury or loss of life Refer to the user s information manual provided with this heater Installation and service must be performed by a qual...

Страница 2: ...D 2 Power Vent If there are any questions which this manual does not answer please contact your local Raypak Representative THIS MANUAL SHOULD BE MAINTAINED IN LEGIBLE CONDITION AND KEPT ADJACENT TO T...

Страница 3: ...usly re move the inner stack adapter and replace it with the PowerVent stack adapter Otherwise install the PowerVent stack adapter 4 Unscrew the access panel on the right side of the appliance Set asi...

Страница 4: ...and blower motor NOTE The 90 elbow may be used as a termination cap MOUNTING POWER VENT ASSEMBLY continued 11 Mount the PowerVent assembly bottom on the 6 vent Twist the assembly downward Snap the mou...

Страница 5: ...he flue gas leakage Care must be taken during assembly to insure that all joints are sealed properly and are airtight The vent must be installed to prevent the potential accumulation of condensate in...

Страница 6: ...ng guide or factory The D 2 Power Vent assembly is suitable for through the wall venting and for connection to smaller size vent pipes and breeching other than the standard atmospheric heater The D 2...

Страница 7: ...7 185 405 POOL HEATER ATMOSPHERIC...

Страница 8: ...8 185 405 POOL HEATER Low NOx...

Страница 9: ...9 182 260 WH1 ATMOSPHERIC...

Страница 10: ...181 261 WH1 Low NOx 10...

Страница 11: ...en the automatic main gas valves will open and the heater will operate When the operating limit circuit is satisfied the heater will shut down 11 Dimensional Data Model A B C D 181 18 13 12 38 7 88 4...

Страница 12: ...Turn operating control to end call for heat 6 Wait a minimum of 60 seconds 7 Open pilot gas valve a Repeat procedure outlined in 4 above 8 After pilot gas is proven and main safety shut off valve is...

Страница 13: ...ILLUSTRATED PARTS LIST 13 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15...

Страница 14: ...5300 FAX 800 872 9725 Raypak Canada LTD 2805 Slough Street Mississauga Ontario Canada L4T 1G2 905 677 7999 FAX 905 677 8036 Raypak Australia Pty Ltd 7 Geddes St Mulgrave Victoria Australia 3170 6139 5...

Отзывы: