
2.1 Installation checklist
Installation includes the following activities:
Installation Task
1
Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4
Route all cables.
5
Drill cable and mounting holes.
6
Make all connections into equipment.
7
Secure all equipment in place.
8
Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any installation.
It is also useful for any future additions or maintenance of the
system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
2.2 Parts supplied
D12312-1
2
4
1
3
1.
Network switch.
2.
Fixing screws.
3.
Power cable (red and black).
4.
Documentation pack, consisting of:
• Installation instructions.
• Mounting template.
• Warranty policy.
10
HS5
Содержание HS5
Страница 2: ......
Страница 4: ......
Страница 6: ...6 HS5...
Страница 18: ...18 HS5...
Страница 26: ...26 HS5...
Страница 28: ...28 HS5...
Страница 29: ......
Страница 30: ...www raymarine com...