Wuhan Raycus Fiber Laser Technologies Co., Ltd.
User Guide of RFL-C6000S-CE
26
Figure 10 The main interface is displayed when the communication connection is normal
4.5
Steps of Installation
a) Carefully takeout the laser from the box and move it to the installing position and then
lock the casters;
b) Remove the output cable protective cap and check the output lens for dust with strong
light and clean it if necessary, then cover the output cable protective cap;
c) Install the output cable on the processing equipment according to the actual situation
(install the output head cooling water pipe at the same time), pay attention to the output
cable and head,then remove the protective cap andconfirm that the output lens is clean
and install the output head
;
d) Connect cooling water pipe;
e) Connect the control line and power according to the control mode.
4.6
Steps of Starting
It is determined that the air switch is disconnected, and all electrical connections must be
completed before the laser is powered on;
a) Make sure that the pins the 24-pin are closed;