Balanced Flue Installation (Extension Kit 430-660mm)
PREPARATION
SEE FIG. 21
❏
Mark and cut holes in wall for terminal duct and oven
vent.
SEE FIG. 22
❏
Establish wall thickness
(A)
.
❏
Establish distance between flue mounting plate
(when the cooker will be in final location) and internal wall
(B)
.
20
FIG. 21
DESN 511265
FIG. 22
DESN 511266