![Rayburn Heatranger 460K Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/rayburn/heatranger-460k/heatranger-460k_installation-instructions-manual_3889644020.webp)
18
SEE FIG. 9
1.
Open the burner access door. Remove door and put
in a safe place.
2.
Remove 2 inner panel securing screws and remove
panel.
3.
Remove the 3 plinth securing screws and remove
plinth.
SEE FIG. 10
1.
Make electrical connections to terminal strip as
wiring diagram (See Fig. 12).
SEE FIG. 11
1.
Bring the sensing phial of the fire valve through the
grommet in the right hand side panel and locate in
the clips provided.
2.
Before connecting the flexible oil pipe to the pump
inlet, open the stop valve slowly and run off some of
the oil into a receptacle to establish an air free and
clean supply to the pump. Make the connection onto
the oil pump tight and leave valve open.
3.
Ensure that the fire valve is routed to allow free
removal of the twin burner assembly.
Commissioning Instructions
FIG. 9
DESN 511578
DESN 511577
DESN 511611
FIG. 10
FIG. 11
BURNER ACCESS
OIL PUMP
ELECTRICAL CONNECTION
TERMINAL STRIP
Содержание Heatranger 460K
Страница 16: ...14 Site requirements FIG 4 460 480 499 K...
Страница 19: ...Installation requirements 17 FIG 8A...
Страница 26: ...24 Sealed System FIG 18...
Страница 27: ...25...
Страница 28: ...26...
Страница 29: ...27...