background image

MAINTENANCE

The power unit should be checked frequently for debris and/or build up on the cooling fans which may interfere with 
proper flow to cool the unit during operation. The cooling fans should be cleaned with a vacuum to remove any buildup at 
least every 3 months or more frequently if the unit is mounted in a an area where excess dust or debris my be present. 

Deep Cycle Batteries generally last between 3 to 5 years in a sump pump backup installation. It is recommended that the 
battery is tested every 6 months to ensure it is ready for service.

FOR YOUR RECORDS

Date of Purchase 

Place of Purchase 

Serial Number

ATT

ACH RECEIPT HERE

Installed by:

Model Number

Note:

You 

MUST

 retain your original purchase receipt along with this manual. In 

the event that you need to exercise a warranty claim, you 

MUST 

send a copy 

of the purchase receipt along with the material or correspondence. Please 

call RAYBEND (269-254-8497 for return authorization and instructions.

Содержание RAI-1500

Страница 1: ... Backup Power System 2723 Kersten Court Kalamazoo Michigan 49048 www RAYBEND com Phone 269 254 8497 2020 RAYBEND All Rights Reserved NOTICE INSTALLER Please provide this manual to the property owner responsible for the service and maintenance of the sump pump system ...

Страница 2: ...F and well ventilated Avoid installing in direct sunlight DO NOT bypass grounding wires or remove the ground prong from the plug DO NOT use an extension cord NEVER plug this unit into an outlet while standing on a wet surface NEVER lift this product by the electrical power cord NEVER attempt to open or service this unit while it is connected to an electrical power supply DO NOT pump gasoline or an...

Страница 3: ...rging the deep cycle battery The Charging Indicator will be RED while charging the battery and GREEN once the battery is fully charged When you loose household power the Power Unit will automatically activate and convert your 12VDC Battery to 120 VAC Pure Sine Wave output at both of the Power Unit Outlets It is recommended that you keep both the Charger Switch and the Power Switch in the ON positi...

Страница 4: ...commendation 6 Plug the power unit into the 120 VAC outlet 7 Confirm that the Charger Switch and Power Switch are in the OFF Position Plug your sump pump into either of the two 120 VAC Output Power Outlets 8 Turn on both the Charger Switch and the Power Switch The LEDs above both switches should be green Your system is now properly setup TROUBLE SHOOTING Always disconnect the power unit from power...

Страница 5: ...loat is stuck in the on position Check to make sure the float is free to move up and down without obstruction 2 Switch may be defective Consult factory PUMP RUNS BUT DELIVERS VERY LITTLE WATER 1 Vertical lift is approaching the pump s maximum lift capability Refer to the above maximum lift chart 2 Pump s inlet is partially blocked Check to make sure the inlet is clear of debris 3 Discharge line is...

Страница 6: ...Cycle Batteries generally last between 3 to 5 years in a sump pump backup installation It is recommended that the battery is tested every 6 months to ensure it is ready for service FOR YOUR RECORDS Date of Purchase Place of Purchase Serial Number ATTACH RECEIPT HERE Installed by Model Number Note You MUST retain your original purchase receipt along with this manual In theeventthatyouneedtoexercise...

Страница 7: ...e of the United States including its territories and possessions outside of U S Military Exchange and outside of Canada This warranty does not cover products purchased from a party that is not an authorized retailer dealer or distributor of RAYBEND products OTHER IMPORTANT TERMS This warranty is not transferable and may not be assigned This Warranty shall be governed and construed under laws of th...

Страница 8: ......

Отзывы: