Installation:
17
INSTALLATION
3. Insert the 3 connectors from the RCM - Sprayer product control cable (P/N 115-7301-032) to the RCM - Sprayer
ECU.
NOTE:
The cable connectors will only fit one way in the RCM - Sprayer ports.
The gray connector is the power/communication connector. The 23 and 35-pin black connectors are used for
signal inputs and outputs.
4. Connect the flow and pressure sensors to the RCM - Sprayer product control cable. Check the connector labels
for assistance with proper connections.
5. If the boom has recirculation, connect the recirculation pump and in/out valve cable (P/N 115-0172-645) to the
connector labeled AUX drivers on the RCM - Sprayer product control cable.
CONNECT THE SIDEKICK PRO™ ICD PUMP AND CABLES
1. Connect the Gen3 Sidekick Pro™ Injection Cable (P/N 115-7301-016) to the Sidekick Pro™ ICD pump.
2. Plug the black and gray connectors into the Sidekick Pro™ ICD pump.
FIGURE 17. Sidekick Pro™ ICD Pump Connections
3. Plug the PSI, FLOW, and VAC connectors to the sensors on the Sidekick Pro™ ICD pump. Check the connector
labels to ensure proper connections.
4. Connect the rinse assist connector from the Gen3 Sidekick Pro™ ECU cable (P/N 115-7301-016) to the rinse
valve.