background image

Cab Component Installation: 

9

CAB COMPONENT INSTALLATION

INSTALL THE NODE HARNESS

FIGURE 4. 6-Pin Deutsch Connector on Node Harness

1. Connect the PWR/ENABLE 6-pin Deutsch connector to the mating connector on the machine harness.

FIGURE 5. Machine Ground Bus Bar

2. Locate the machine ground bar on the right side of the compartment.
3. Install the two ground wires on the grounding bar.
4. Locate the fuse panel on the right side of the compartment.
5. Remove the bolt from the machine red battery cable.

Содержание HDU

Страница 1: ...Copyright 2019 TC1 HDU Installation Manual for Buhler Versatile Row Crop Steer Ready MY2015 Newer 016 5031 103 Rev B 11 2019 E33670 ...

Страница 2: ...aven Industries shall not be held responsible for any modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affect the availability and accuracy of wireless and satellite navigation and correction services e g GPS GNSS SBAS etc Therefore Raven Industries cannot guarantee t...

Страница 3: ...ns 4 Point of Reference 5 Kit Contents 5 Chapter 3 Cab Component Installation 7 Install the TC1 and HDU Nodes 7 Mount the TC1 and HDU Nodes 7 Install the Node Harness 9 Bulkhead Connection 10 Connect HDU and TC1 11 Install the Foot Switch Optional 11 Route the foot switch cable connector to the node mounting location 11 Install the Master Switch 11 Install the Valve Harness 12 System Diagrams 14 ...

Страница 4: ...Table of Contents ii TC1 HDU Installation Manual for Buhler Versatile Row Crop Steer Ready MY2015 Newer ...

Страница 5: ... alert and aware of surroundings Do not operate TC1 or any agricultural equipment while under the influence of alcohol or an illegal substance Remain in the operator position in the machine at all times when TC1 is engaged Disable TC1 when exiting the operator seat and machine Do not drive the machine with TC1 enabled on any public road Determine and remain a safe working distance from other indiv...

Страница 6: ... be exercised Any work performed on the hydraulic system must be done in accordance with the machine manufacturer approved maintenance instructions When installing TC1 hydraulics or performing diagnostics maintenance or routine service ensure that precautions are taken to prevent any foreign material or contaminants from being introduced into the machine hydraulic system Objects or materials that ...

Страница 7: ...INTRODUCTION This manual applies to the following machines For future reference write your serial number in the space below MAKE Buhler Versatile MODEL Row Crop 265 295 315 335 365 YEAR 2015 Newer FIGURE 1 Buhler Versatile Row Crop 365 ...

Страница 8: ...rs to identify the parts Do not remove the plastic wrap from a part until it is necessary for installation Do not remove plastic caps from a part until it is necessary for installation POINT OF REFERENCE The instructions in this manual assume that you are standing behind the machine looking toward the cab At Raven Industries we strive to make your experience with our products as rewarding as possi...

Страница 9: ... the kit contact your Raven dealer FIGURE 2 TC1 HDU Kit for Versatile Row Crop MY 2015 and Newer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 6 7 72 217 1 7 2 2 1 7 06 67 2 8 5 8 5 9 81 7 8 8 62 7 2 63 67 5 1 8 56 9 56 7 75 7256 8 9 9 56 9 56 7 52 523 75 7256 0 66 0 0 67 5 6 7 56 5 7 7 8 9 56 7 52 523 75 7256 1 32 5 5 9 1 62 8 72 97 3 5 3 19 23 3 67 286 1 52 5 6 7 6 286 1 52 5 6 7 29 5 2 7 1 0 00 187 2 1 21 16...

Страница 10: ...CHAPTER 2 6 TC1 HDU Installation Manual for Buhler Versatile Row Crop Steer Ready MY2015 Newer ...

Страница 11: ...THE TC1 AND HDU NODES MOUNT THE TC1 AND HDU NODES 1 Mount the TC1 P N 063 0174 070 and the HDU P N 063 0173 887 nodes to the cab bracket P N 107 0172 648 FIGURE 1 TC1 and HDU Node Mounting Bracket 2 Secure the nodes to the bracket using the supplied 1 4 20 lock nuts HDU Node TC1 Node ...

Страница 12: ...Location Before Installation 3 Remove the rear panel behind the operator seat 4 Remove the two brass bolts securing the bracket with the 2 round connectors 5 Place the node mounting bracket assembly under the panel latch bracket 6 Secure with the supplied M6x20mm bolts FIGURE 3 Node Mounting Location After Installation ...

Страница 13: ...WR ENABLE 6 pin Deutsch connector to the mating connector on the machine harness FIGURE 5 Machine Ground Bus Bar 2 Locate the machine ground bar on the right side of the compartment 3 Install the two ground wires on the grounding bar 4 Locate the fuse panel on the right side of the compartment 5 Remove the bolt from the machine red battery cable ...

Страница 14: ... from the power wires and crimp new ring terminals P N 405 0200 052 or 405 0200 053 on the end 7 Reinstall the machine red battery cable on the bolt 8 Reinstall the bolt in the fuse panel 9 Loop and tie off the REMOTE SWITCH cable connection securing it with plastic cable ties as necessary BULKHEAD CONNECTION 1 Remove machine bulkhead connector and insert round connector in the removed bulkhead lo...

Страница 15: ...ect a suitable location for the foot switch P N 063 0172 470 to be installed NOTE The foot switch should be installed in a location where the operator has easy access to it and is able to fully press the pedal 2 Using the holes in the foot switch as a template drill holes in the floor of the cab 3 Secure the foot switch to the floor by installing the supplied screws in each of the mounting holes 4...

Страница 16: ...not provided 3 Locate the 4 pin connector on the cab harness P N 115 4010 127 labeled Steering Lockout Switch and connect it to the master switch INSTALL THE VALVE HARNESS FIGURE 10 Valve Harness Secured to Bulkhead 1 Connect the round 21 pin connector on the valve harness P N 115 4001 159 to the mating bulkhead connector under the machine cab 2 Route the valve harness toward the existing valve lo...

Страница 17: ... the open 4 pin Deutsch port on the PVES valve FIGURE 12 WAS Connection 5 Route the WAS connectors of the valve harness toward the front axle 6 Disconnect the machine existing WAS connection 7 Install the WAS connectors of the valve harness between the machine WAS connectors 8 Use plastic cable ties to secure any excess cable away from moving parts and heat sources TRANSDUCER Connection Transducer...

Страница 18: ...CHAPTER 3 14 TC1 HDU Installation Manual for Buhler Versatile Row Crop Steer Ready MY2015 Newer SYSTEM DIAGRAMS FIGURE 13 Valve and Node Harness Wiring Diagram ...

Страница 19: ...alling the Node Harness 9 Installing the Valve Harness 12 System Diagrams 14 E Electrical Safety 2 H Hydraulic Safety 2 I Important Safety Information Electrical Safety 2 Hydraulic Safety 2 Introduction 3 Kit Contents 5 Preparing for Installation 4 Point of Reference 5 Recommendations 4 Updates 4 K Kit Contents 5 ...

Страница 20: ...Index 16 TC1 HDU Installation Manual for Buhler Versatile Row Crop Steer Ready MY2015 Newer ...

Страница 21: ...er s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries WHAT WILL RAVEN INDUSTRIES DO Upon confirmation of the warranty claim Raven Industries will at our discretion repair or replace the defective product and pay for the standard return freight regardle...

Страница 22: ... claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries In addition the words Extended Warranty must appear on the box and all documentation ...

Отзывы: