Cab Component Installation:
9
CAB COMPONENT INSTALLATION
INSTALL THE NODE HARNESS
FIGURE 4. 6-Pin Deutsch Connector on Node Harness
1. Connect the PWR/ENABLE 6-pin Deutsch connector to the mating connector on the machine harness.
FIGURE 5. Machine Ground Bus Bar
2. Locate the machine ground bar on the right side of the compartment.
3. Install the two ground wires on the grounding bar.
4. Locate the fuse panel on the right side of the compartment.
5. Remove the bolt from the machine red battery cable.