3
Boom Installation:
15
BOOM INSTALLATION
1. Locate the terminator on each of the secondary boom cables (refer to the Kit Contents section on page 8).
FIGURE 3. Secondary Cable ISOBUS Powell Terminator
2. Route the secondary boom cables so the terminators are located at the outer tips of the left and right boom.
3. Starting from the mid-boom fold point, feed the terminator end of the secondary boom cable through the
boom framework along existing cable or plumbing runs and through any existing cable retention devices as
appropriate.
4. Once the secondary boom cable is routed appropriately, begin connecting the valve tee branches to the nozzle
control valves, starting with the nozzle control valve at the outer end of the boom.
5. After connecting the harness to the NCV, secure the tee in the cable using the provided harness mounting
clamps.
FIGURE 4. Securing using Mounting Clamps
6. At each valve branch, adjust the cable as necessary to provide slack between nozzle control valve connections.
7. Repeat this procedure to route and connect the secondary boom cable on the opposite boom.
NOTE:
120’ booms require mid-boom cables in addition to the primary and secondary cables. Connect the
mid-cable to the secondary cable. Follow the procedure above while working from the outside of the
boom towards the center.
PRIMARY BOOM CABLE ROUTING AND CONNECTIONS
NOTE:
Review the System Diagram section on page 17 before routing or securing the boom cables on the
implement. It is recommended not to connect or secure the cable until instructed to do so in the
procedure.
Powell
Terminator
Содержание AIM Command FLEX
Страница 4: ...Table of Contents ii AIM Command FLEX Patriot MY 2017 Installation Manual ...
Страница 10: ...CHAPTER 1 6 AIM Command FLEX Patriot MY 2017 Installation Manual ...
Страница 21: ...3 Boom Installation 17 BOOM INSTALLATION SYSTEM DIAGRAM ...
Страница 22: ...CHAPTER 3 18 AIM Command FLEX Patriot MY 2017 Installation Manual ...
Страница 28: ...CHAPTER 4 24 AIM Command FLEX Patriot MY 2017 Installation Manual ...