![background image](http://html.mh-extra.com/html/raven/aim-command-flex/aim-command-flex_installation-manual_788957020.webp)
C
HAPTER
3
16
AIM Command FLEX, Patriot MY 2017 Installation Manual
1. Locate the large, round connectors on the primary boom cables (refer to the Kit Contents section on page 8).
The primary boom cables must be routed such that the connector labeled “TO CHASSIS HARNESS” is located
at the center of the spray boom and will connect to the power harness.
2. Starting at the center of the implement, feed the non-chassis end of the primary boom cable through the
boom framework along existing cable or plumbing runs and through any existing cable retention devices as
appropriate.
3. Install an electrical bulkhead bracket at the connection point between the primary and secondary boom cables.
FIGURE 5. Electric Bulkhead Bracket
4. Connect the large, round connectors on the primary and secondary boom cables.
5. Adjust the primary and secondary boom cables to ensure sufficient slack around the mid-boom fold point and
allow each cable to reach nozzle control valves near the folding point.
6. Secure the primary and secondary connection using the supplied zip ties as necessary to protect the connector
from damage during folding and unfolding operations.
7. Once the primary and secondary boom cables are connected, begin connecting the valve tee branches to the
nozzle control valves, starting with the valve on the primary boom segment furthest from the center of the
implement.
8. At each valve branch, adjust the cable as necessary to provide slack between nozzle control valve connections
and use the supplied zip ties and saddle mounting harness clamps to secure the cable at each valve branch.
Refer to Figure 4 on page 15. The “TO CHASSIS HARNESS” on the primary boom cable should reach to the
center of the implement after all nozzle control valves are connected.
9. Repeat this procedure to route the primary boom cable on the opposite boom.
Содержание AIM Command FLEX
Страница 4: ...Table of Contents ii AIM Command FLEX Patriot MY 2017 Installation Manual ...
Страница 10: ...CHAPTER 1 6 AIM Command FLEX Patriot MY 2017 Installation Manual ...
Страница 21: ...3 Boom Installation 17 BOOM INSTALLATION SYSTEM DIAGRAM ...
Страница 22: ...CHAPTER 3 18 AIM Command FLEX Patriot MY 2017 Installation Manual ...
Страница 28: ...CHAPTER 4 24 AIM Command FLEX Patriot MY 2017 Installation Manual ...