
34
4.
Wait for gauge reading to stabilize.
5.
To remove gauge: Rotate 1/4 turn
Counter Clockwise
.
6.
Add/Remove air to achieve minimal operating pressure as stated
for each module.
7.
Close Valve Cap.
Inflate to recommended operating pressure printed on each module. To
avoid damaging the unit,
DO NOT OVER INFLATE
beyond the stated
pressure.
To Deflate:
Rapid deflation can be achieved using the “deflate” side of the motor housing.
Attach the hose to the deflate side of the motor housing and lock the valve
adaptor into the valve.
NOTE:
It is normal for the air pressure within air filled tubes to fluctuate
depending on air and water temperatures. It may be necessary to increase or
decrease the air pressure in your product accordingly. To avoid damage on
extremely hot days it may be necessary to check and release the air pressure
from your product throughout the day. Monitor the air pressure in the product
periodically. Add or let out air as necessary to maintain proper operating
pressure.
Move to Water:
Use 2 people to carry each section to the water.
CAUTION
: To avoid risk of puncture or damage to the product, DO NOT
DRAG the product. Always carry it to the water. Do not drag it from shore or
pool edge into the water. Float in shallow water until all pieces are connected
together, then move to the desired location for anchoring.
!
WARNING
Содержание 02477
Страница 47: ...47 Septic Tank Cover Cinder Blocks Land Screw...