27
GB
Electrical connection of the UV
Danger!
High voltage
Observe local regulations and standards during
installation!
Installation of the bus cable:
> At the rear side of the UV the connection box
with the control pcb is located.
> A bus cable is already connected to the PCB. This
bus cable is carrying a second cable gland for
connection to the unit.
> Remove the left side panel of the unit.
Installation instruction
Содержание 60.73.945
Страница 179: ...179 GR...
Страница 180: ...180 Ultravent...
Страница 181: ...181 GR UV EN 60335 2 99 2016 Rational Technical Services...
Страница 183: ...183 GR 4 1 2 3 4 1 PG 2 3 4 UV UV UltraVent 3...
Страница 184: ...184 1 UV 2 UV 3...
Страница 185: ...185 GR 4 4 5 UV UV...
Страница 186: ...186 6 UV 7 UV 8 UV...
Страница 187: ...187 GR 9 UV UV...
Страница 188: ...188...
Страница 189: ...189 GR UV UV...
Страница 190: ...190 i UV VDE SelfCooking Center UV UV 3mm UV UV 16 UV 2 H05 RN F 3x1 5 mm2...
Страница 191: ...191 GR Combi Duo Combi Duo 60 73 945 Ultravent Combi Duo UV e UV UV 5 UV UV UV...
Страница 192: ...192 5 UV UV UV UV Combi Duo...
Страница 193: ...193 GR UltraVent UV UV UV UV UV UV UV UV...
Страница 195: ...195 657 25 7 8 505 19 7 8 83 3 1 4 220 8 3 4 20 7 8 580 22 7 8 mm 75 3 min 350 mm 450mm 18...
Страница 196: ...196 80 05 838 UV XS V 03 08 2017 Rational Technical Services Dja...