![Rath Janus SmartView Visual Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/rath/janus-smartview-visual/janus-smartview-visual_installation-and-operation-manual_3769400006.webp)
For initial setup, the SmartView Head-End will need to be connected to the internet.
1. Install the SmartView Controllers before setting up the Head-End (see instructions on page 3).
2. Power on the Head-End and wait for the software to load.
3. Click the SmartView icon to begin linking the Head-End Controllers.
4. On the Configuration Screen, enter each SmartView ID installed at your location.
5. Click
Submit.
Note:
If you see an error, re-check that a proper ID was entered.
6. The IDs will be displayed on the next page.
7. Once successfully linked, you will see a list of the devices with a view icon next to each.
Note:
Wait at least 2 minutes to allow the SmartView devices to link before testing.
Note:
To verify operation, click the view icon for one of the devices.
In-Building Intercom Master Setup
Page 6
1. Follow the previous installation steps, omitting steps involving the SmartView Display.
2. Mount the CE Elite PI Display in the elevator.
3. Follow the wiring schematic below for connecting the SmartView Controller with a CE Elite PI Display via the
RS485/422 connectors.
Installation with CE Elite PI Displays
SmartView
Camera
To SmartView Camera
YES
To Network Switch
or
Ethernet Extender
CE Elite PI Display
HDMI
Display
Power
Aux
Power
USB
Ethernet
SmartView Controller
(12v, 1A or 24v 0.5A)
YES NO
TX+
TX-
COM
RX+
RX-
NO