Page 6
Adjusting the Photocell (If Equipped):
1.
Slide the cover to the proper position on the photocell in order for the blue light to be lit at the proper time
(see drawing below). The cell may need to be partially covered if the Tower is near a light source.
Solar Panel Wiring and Testing:
1.
Remove the face plate (see Figure 1).
2.
Remove the cover of the NEMA 4 enclosure by loosening the four corner screws.
3.
Locate the Sun Saver in the NEMA 4 enclosure (see drawing below).
4.
Using a voltmeter, check each set of terminals for Solar, Battery, and Load. The voltage should
measure between 12.6 and 13.8 volts on each set. If voltage is low, recheck connections.
Sun Saver
Photocell
Cover
Communication
Landline:
To connect your analog phone line to the Tower:
1.
Open Access Panel 1 (see Figure 1) using the torx bit to remove the security screws.
2.
Locate the gray phone cable coming out of the NEMA 4 box.
3.
Connect the gray phone cable to the phone cable that was run through the conduit either by connecting the
modular jack or the red and green wires.
Содержание 2100-TS9
Страница 11: ...Page 11 Wiring Optional...