6
B) Burner Pipe
Ember Burners
D) 3/8 Orifice Holder
C) Orifice Spud
A) Burner
Plug
FIGURE 4
E) Flared
End
F) Rating Plate
/
Heat Shield
STEP THREE: BURNER PAN ASSEMBLY
Natural Gas Models; F, FH, FX and FXH (All other Models refer to supplied instructions)
NOTE:
If fittings do not come pre-wrapped with Teflon threaded tape, pipe compound MUST be applied to all tapered pipe threads
(except in #3 of Step 3) to prevent gas leaks.
DO NOT
use Teflon tape or pipe compound on
any
flared fitting threads.
1. Thread
Burner Plug
(Figure 4A.) into the
Burner Pipe
(Figure 4B) at opposite end of gas supply
and wrench tighten.
2. Thread
Orifice Spud
(Figure 4C) into
3/8” Orifice Holder
(Figure 4D) (Do not use pipe compound or Teflon tape here)
NOTE:
The Orifice Spud is a gas consumption limiter. Higher flames (and greater gas consumption) may result if
orifice spud is not installed.
3. Thread Orifice Holder into Burner Pipe and wrench tighten with the flared end facing rear wall of firebox (Figure 4E).
4. Insert
Rating Plate/Heat Shield
(Figure 4F) onto the threads of and the Burner Pipe with labels facing away from
the burner.
STEP FOUR: GAS SUPPLY CONNECTION
(NOTE: ENSURE THAT GAS SUPPLY TO FIREPLACE IS OFF)
1. Thread
1/2” FIP x 3/8” Flared Elbow
(Figures 5and 6A) onto the
Gas Supply Pipe
(Figures 5 and 6B) and wrench
tighten. If space between Gas Supply Pipe and Firebox floor allows, the flared end of the 1/2” FIP x 3/8”Elbow
should
face down. (Figure 6A)
2. With Burner Pan inside firebox at previously marked position thread one end of the
Flex Connector
(Figures 5 and
6C) to the
1/2” FIP x 3/8” Flared Elbow
and wrench tighten. Do not use pipe compound or tape on
any
flared threads.
3. Carefully bend the
Flex Connector
into position, connect to the
Orifice holder
and wrench tighten. If Flex Connector
is bent into too small of a radius it may kink or break causing air flow noise and/or gas leaks.
4. Proceed to Page 11 “Pan Medium Installation”
FIGURE 5
Side View
●
Keep the Flex Connector as
close to bottom inside edge
of firebox floor as possible
B) Gas Supply
Pipe
A) 1/2’ FIP X 3/8
Flared Elbow
Rating Plate/Heat Shield
C) Flex Connector
STANDARD MATCH LIGHTED (NATURAL GAS MODELS ONLY)