background image

 

CC-SG E1 Quick Setup Guide 

1

QSG-CCE1-0G-v5.0.0-E 

y

 255-80-5400-01-RoHS 

 

CommandCenter Secure 
Gateway E1 Models 

Quick Setup Guide 

Thank you for your purchase of the CommandCenter Secure Gateway, Raritan's management software platform 
engineered to consolidate secure access and control of IT devices. This Quick Setup Guide explains how to install and 
configure the CommandCenter Secure Gateway.   

For additional information on any aspect of the CommandCenter Secure Gateway, see the accompanying online help 
accessed from the CommandCenter Secure Gateway or from the CommandCenter Secure Gateway User Guide, which 
can be downloaded from the Firmware and Documentation section of Raritan's website 
(http://www.raritan.com/support/firmware-and-documentation/). 

 

   

Diagram Key 

1 LAN 

ports 

2 Power 

3 KVM 

ports 

 

 

I. Unpack CC-SG 

With your shipment, you should receive:  

(1) CommandCenter Secure Gateway E1 unit 

(1) CommandCenter Secure Gateway E1 front bezel 

(1) Rack mount kit 

(2) Power supply cord 

(1) CAT 5 network cable  

(1) Printed Quick Setup Guide 

(1) Registration and Warranty papers 

 

Determine Rack Location 

Decide on a location in the rack for CC-SG, in a clean, dust-
free, well-ventilated area. Avoid areas where heat, electrical 
noise, and electromagnetic fields are generated and place it 
near a grounded power outlet. 

 

QS Rule 

 

II. Rack-mount CC-SG 

Before rack-mounting CC-SG, unplug all power cords and 
remove all external cables and devices. 

 

The rack mount kit contains:  

 

2 pairs of rack rails 

Each pair consists of two sections: an inner rail that 
attaches to the CC-SG unit, and an outer rail that 

Отзывы: