SECTION 7: V
ENTING
13 of 45
operation, while any other equipment connected to
the venting system are not in operation.
1. Seal any unused openings in the venting
system.
2. Inspect the venting system for proper size and
horizontal pitch, as required by the NFPA 54/
ANSI Z223.1 - latest revision, National Fuel
Gas Code (US) or Standard CSA B149.1
Natural Gas and Propane Installation Code
(Canada) and these instructions. Determine
that there is no blockage or restriction, leakage,
corrosion and other deficiencies which could
cause an unsafe condition.
3. Close all building doors and windows and all
doors between the space in which the piece(s)
of equipment connected to the venting system
are located and other spaces of the building.
Turn on clothes dryers and any exhaust fans,
such as range hoods and bathroom exhausts
so that they shall operate at maximum speed.
Do not operate a summer exhaust fan. Close
fireplace dampers.
4. Follow the lighting instructions. Place the
equipment being inspected in operation.
Adjust thermostat so that the equipment will
operate continuously.
5. For any equipment having a draft hood, test for
draft hood equipment spillage at the draft hood
relief opening after five minutes of main burner
operation. Use the flame of a match or candle.
6. After it has been determined that each piece(s)
of equipment connected to the venting system
properly vents when tested as outlined above,
return doors, windows, exhaust fans, fireplace
dampers and any other gas-burning piece(s) of
equipment to their previous conditions of use.
7. If improper venting is observed during any of
the above tests, the venting system must be
corrected by a contractor qualified in the
installation and service of gas-fired equipment
or your local gas supplier. If the venting must be
resized, use appropriate tables in (US)
Appendix G of NFPA 54/ANSI Z223.1 - latest
revision, National Fuel Gas Code (US) or
Standard CSA B149.1 Natural Gas and
Propane Installation Code (Canada) to
determine minimum size. All vent corrections
must be in accordance with the appropriate
local codes and the NFPA 54/ANSI Z223.1 -
latest revision, National Fuel Gas Code (US) or
Standard CSA B149.1 Natural Gas and
Propane Installation Code (Canada).
Figure 8: Vent and Roof Detail
Содержание UHDS 100
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 28: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 20 of 45 Figure 14 Gas Connection ...
Страница 42: ...UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 34 of 45 14 1 General ...
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......