
GB-6
ZT 220D
Series
ASSEMBLY AND SETUP
7.
TRACTION LEVERS
a) Loosen bolt
A
and remove bolt
B
.
b) Rotate traction lever
D
into position and secure
with bolts
A
and
B
. Repeat for the other lever.
c) Tighten all fasteners.
d) Sit on the machine. Levers may be adjusted in
bracket
C
for a more comfortable reach, or
moved to upper set of holes for a better operator
fit.
8.
DECK LEVELING
a) Park the machine on a smooth, level surface.
Raise the deck to the transport position.
b) Lower the deck onto a set of equal height blocks
A
under the rear corners of the deck. Place
another set of blocks
B
under the front of the
deck so that the deck top is pitched forward 1/8”.
NOTE:
The front and rear of the deck are at different
heights.
c) Measure the height of the blade cutting edge
above the ground. Remove pin
C
and set the
height of cut lever
D
to that height
d) Loosen the jam nuts on the height of cut clips
and adjusting screws
E
. Turn the adjusting
screws
E
until the play is taken out of the chains
at all four corners. Tighten the jam nuts against
the clips and at the adjusting screws.
Содержание ZT220D
Страница 59: ......