AH-94-04.7
REA-90 and 90L Spray Applicators - Maintenance
4 1
4 1
4 1
4 1
4 1
HOOK / TRANSFORMER
HOOK / TRANSFORMER
HOOK / TRANSFORMER
HOOK / TRANSFORMER
HOOK / TRANSFORMER
ASSEMBL
ASSEMBL
ASSEMBL
ASSEMBL
ASSEMBLY
Y
Y
Y
Y
Removal
Removal
Removal
Removal
Removal
1. The following procedures must be performed
prior to removing the hook/transformer assembly.
• Barrel Removal from Applicator
• Low Voltage Cable Removal
• Fluid Hose Removal and Fluid Tube
Removal (for Solvent Base Applicators) or Fluid
Hose Removal (Waterborne Applicators)
• Low Voltage Cable Plug Assembly
Removal
Figure 15: Hook/Transformer Removal
Figure 15: Hook/Transformer Removal
Figure 15: Hook/Transformer Removal
Figure 15: Hook/Transformer Removal
Figure 15: Hook/Transformer Removal
23
Handle
24
Set Screw
25
Hook/Transformer
78
Low Voltage Cable Plug Assembly
Item #
Item #
Item #
Item #
Item #
Description
Description
Description
Description
Description
7. Check the spacing between the back of the
spring retainer and the handle. It should be about
1/8-inch. If not, check for one or more of the
following:
• Gasket has been left out
• Loose retaining nut
• Loose fluid nozzle
• Improper adjustment of the trigger
adjustment nut and spring retainer
8. Place the grounding spring over the air valve
stem.
9. Pull the grounding spring back and slide the
trigger into position.
10. Secure the trigger with the two (2) shoulder
screws.
>
The needle shaft travel MUST be
checked. The air valve stem must be en-
gaged and move back slightly before the
trigger engages the trigger adjustment nut.
If this does not occur then the trigger ad-
justment nut and/or the trigger set screw
must be adjusted. The 11/16-inch dimen-
sion is only a starting place for trigger ad-
justment and can be altered to obtain
proper triggering sequence.
N O T E
N O T E
N O T E
N O T E
N O T E