MAST AND BRIDGE SET UP AND TAKEDOWN
SEDAN
MAST SET UP PROCEDURE
1. Remove the three black plastic wing nuts from the mast base.
2. Remove the two mast tie down cables from their storage positions in the roof clips.
3. With the mast tie down cables still loose, raise the mast off of the stainless steel support bar.
4. Secure the stainless steel retaining bar in the appropriate clip attached on the rooftop.
5. Raise the mast to its full extension and ensure that it fits correctly over the mounting studs on the roof
mounting plate.
6. Attach the three black plastic wing nuts to the mounting studs and hand tighten securely.
7. Attach the two mast tie down cables to their appropriate clips on the port and starboard side of the roof.
8. Make sure the mast tie down cables are adjusted properly.
MAST TAKE DOWN PROCEDURE
1. Remove the mast tie down cables from their clips on the port and starboard side of the roof.
2. Remove the three black plastic wing nuts from the mast base mounting studs.
3. Carefully lower the mast onto the stainless steel support bar.
4. Attach the black plastic wing nuts back onto the screws on the mast mounting plate and secure them
for storage by hand tightening.
5. Attach the two mast tie down cables to their storage positions in the roof clips.
6. Recommend securing the mast with a tie down.
COMMAND BRIDGE
COMMAND BRIDGE SET UP PROCEDURE
1. Raise the mast.
2. Loosen black bridge hold down straps (port and starboard sides).
3. Raise bridge.
4. Lock bridge feet in place).
5. Tighten black bridge hld down straps (port and starboard sides).
6. Raise seat and insert seat pins (x2.
7. Install port and starboard command bridge railing and pins.
8. Install aft command bridge railing and pins.
29
Содержание R-31 Series
Страница 1: ...Quality Craftsmanship Since 1958 R 31 Owner s Manual...
Страница 35: ...RANGER TUG R 31 WORKING DECK STE 35 R 31 S R 31 CB...
Страница 39: ...39 WARNING LABEL LOCATIONS...