background image

23

12V HELM CONTROL OPERATION

At Helm

At Helm

Resettable switch 

breakers

Resettable switch 

breakers

STE

Armed = Red light/audible alarm     Off = Red light only.

The bilge pumps operate automatically with electronic float switches regardless of battery  
switch position. 
However, the BILGE PUMP and BILGE PUMP2 will run continuously once their switches are placed 
in the on position. Monitor the outflow accordingly. Do not run when dry.

NAV

LTS

CHART

LTS

AFT

BILGE

FWD

BILGE

BOW

BILGE

MACE

RATOR

FAN

ACCY

WIPER

HORN

WNDLS

WIPER

Содержание R-27

Страница 1: ...Quality Craftsmanship Since 1958 R 27 Owner s Manual...

Страница 2: ...Air Conditioning 16 Webasto Furnace 17 Solar Panel 18 Battery Configuration 19 Fuse Location Values 20 Fuse Location Values 21 Ac Distribution Panel Rotary Switch 22 12V Helm Control Operation 23 Ran...

Страница 3: ...to ensure that all safety equipment is current Operating servicing and maintaining a recreational marine vessel can expose you to chemicals including engine exhaust carbon monoxide phthalates and lead...

Страница 4: ...SYMBOL GLOSSARY 4 STE OPT Attention Important Operating or Maintenance Instructions Attention Electrical Shock Hazard Fresh Water Black Water Fuel Standard Equipment Optional Equipment Hints...

Страница 5: ...l on Trailer motor up 40 7 12 4 m motor down 38 8 11 8 m Beam 8 6 2 6 m Draft motor up 21 5 m motor down 33 8 m Weight Dry with motor 7 000 lbs 3 175 kg Water Bridge Clearance mast down 8 1 2 5 m Heig...

Страница 6: ...Well Drain Aft Bilge Center Bilge Compartment Blower Exhaust Compartment Blower Exhaust Webasto Exhaust NW Only Water Tank Vent Waste Tank Vent Webasto Fresh Air Intake NW Only AC Exhaust LE Only Show...

Страница 7: ...r performance of each system Anchor Locker Drain Bow Thruster Radar TV Antenna Anchor Light Trailering Side Marker Light Fuel Vent w Charcoal Canister Macerator Thru Hull Cabin Sink Drain Diesel Heate...

Страница 8: ...5 6 7 8 9 10 11 Ski Post Pullout Fresh Water Shower Fuel Fill Swim Platform Courtesy Light Trailer Reverse Lights Trailer Running Lights Trailer Turn Brake Lights Cockpit Scupper Drains Trim Tabs Unde...

Страница 9: ...LIGHTS STE Indirect LED Push On Off LED Lights Push On Off LED Lights Lighting Cabin lighting Switch on xture Switch on xture Head light Switch V Berth Indirect LED Light Switch Courtesy LED Visor li...

Страница 10: ...ormation about this filter in the engine manual supplied with your boat Pressure Relief Fuel System Fuel System with Vent Filter 10 Primary fuel water seperator Fuel to engine Primer Bulb Vent filter...

Страница 11: ...ti Strainer Generator Strainer Relief Overflow Thru Hull Raw Water Washdown Head Raw Water Multi Strainer Thru hull Valve Multi Strainer Strainer Relief Overflow Thru Hull Raw Water Washdown Head Raw...

Страница 12: ...o stand for one 1 hour Shorter periods will require greater concentrations of chlorine solution See Table I d Drain chlorine solution from entire system e Flush entire system thoroughly with potable w...

Страница 13: ...or debris on a regular basis if shower is used frequently Shower drain Thru hull Aft AC condensate drain Sump pump Forward Bilge pump Depth Transducer The shower sump box is located underneath the rem...

Страница 14: ...tically by checking for water every 2 5 minutes even with battery switches and breakers in the OFF position However the BILGE PUMP and BILGE PUMP2 will run continuously once their switches are placed...

Страница 15: ...ump out equipment you are using to avoid damage to the waste system Boat owner is responsible for following all applicable laws when using the macerator system to pump out into the surrounding waters...

Страница 16: ...6 AIR CONDITIONING Main Cabin A C Control Panel in Mid Berth Main Cabin A C Unit Under Helm Seat A C Raw Water Pump Sea Strainer Thru Hull Valve Main Cabin A C Air Intake Grill keep uncovered A C Vent...

Страница 17: ...e quarter berth power management center The fuel pump is beneath the galley sink inside of the black box Webasto Furnace Diesel Tank 5 gal behind stove Interior Heat Vent under cup holder V Berth Inte...

Страница 18: ...house battery and 10 is dedicated to the engine battery The green light on the solar display indicates proper operation The solar display is located in the mid berth The controller is located in the...

Страница 19: ...lazarette Once the EMERGENCY PARALLEL switch is placed in the on position the power from the HOUSE batteries will be transferred to the ENGINE battery Use only for EMERGENCY starting of the engine If...

Страница 20: ...e blade type and all values shown below are in Amps To reset reinsert yellow arm up into the breaker To test press red button and the yellow arm should flip down Left Right Trim Tab Toilet Switch Pane...

Страница 21: ...type and all values shown below are in Amps Downrigger Starboard Freshwater Switch Downrigger Port TV Washdown Switch Cabin Light LED Light Switch Fridge Foreward Fridge Aft Underwater Lights USB V Be...

Страница 22: ...ution Panel AC Main 1 AC Main 2 House Engine Thruster AC Distribution Panel with Generator AC Main 1 AC Main 2 MICROWAVE STBD OUTLETS REVERSE POLARITY AC MAIN 1 AIR CONDI TIONER BATTERY CHARGER WATER...

Страница 23: ...bilge pumps operate automatically with electronic float switches regardless of battery switch position However the BILGE PUMP and BILGE PUMP2 will run continuously once their switches are placed in th...

Страница 24: ...RED 16 ss RED 16 ps BLU BLU 16 Wiper Park Wiper Wiper Bilge Pump Bow 8A BRN 16 To Bilge Pump Bow To Lighting Schematic To Lighting Schematic RED 10 Nav Lights Chart Lights Shower Pump 10A M BRN 16 S P...

Страница 25: ...RED BLK 10 Bathroom Lights 12V Outlet Bathroom RED 10 20A Blowers M M YEL 16 Wht 16 Wht 16 Port 1 Port 2 YEL 16 12V Fuse Block C 12V 5A YEL 16 RED 16 12V USB V Berth 5A YEL 16 RED 16 12V 12V USB Port...

Страница 26: ...Sensor Breaker Light Float Switch Fuse Horn Prompt to Outlet Switch SPST Switch SPST Off On Unit Switch DPDT Speaker M Motor SYMBOL KEY Stove Switch 1A ORG BLK 16 Stove see MFR Schematic YEL 16 YEL 16...

Страница 27: ...25 18 ELECTRICAL SCHEMATIC To Acc 1 Schematic RED 10 Bilge Pump Fwd Head LT 5A YEL 16 BLU PUR 16 YEL 16 BLU BLK 16 12V RED 10 RED 10 Macerator Subpanel 8 Switch Helm 8 Gang 4 Gang back lighting see P...

Страница 28: ...low 1 O yellow 1 O yellow 1 25 18 R 27 Power Distribution HOUSE ENGINE THRUSTER INVERTER PARALLEL ELECTRICAL SCHEMATIC See thruster schematic for fuse sizes CHARGE RELAY CHARGE RELAY SWITCH SWITCH SWI...

Страница 29: ...RANGER TUG R 27 WORKING DECK STE 29...

Страница 30: ...s required Check winch Test electrical connection and lights Check tire pressure and condition Check safety chains Check boat straps Check braking system Check hitch for proper connection and lock dow...

Страница 31: ...Inspect and test trim tabs Check condition of bottom paint Check windlass Verify electronics for correct operation Check all inside and outside lights Macerator Valve in proper position and secured I...

Страница 32: ...ation Check zincs and replace as necessary Check and clean water strainer Clear barnacles and debris from hull fittings Trickle charge batteries every 30 60 days Vent boat to prevent mildew Check trai...

Страница 33: ...33 NOTES...

Страница 34: ...34 NOTES...

Страница 35: ...35 NOTES...

Страница 36: ...ut written authorization from Ranger Tugs The information contained herein is correct to the best of Ranger Tugs knowledge and the contents may change without notice and without incurring obligation 2...

Отзывы: