INSTALLATION GUIDE
5047 Raised Base for 5040/5045 Cab Box
ProMaster ( Steel )
Страница 1: ...INSTALLATION GUIDE 5047 Raised Base for 5040 5045 Cab Box ProMaster Steel...
Страница 2: ...Phase 2 Installation q Cordless Impact q Cordless Drill q Tape Measure q Marker q 7 16 Socket q 1 2 Drill Bit w Drill Collar Set at 1 2 Deep q Knife q Plusnut Tool Plusnut Gun 1 4 q 2 1 Installation...
Страница 3: ...sed Base Cab Box ProMaster 1 90 5054 Install Fastener Kit 1 BILL OF MATERIALS 90 5054 Fastener Kit Fastener Install 1 1 3 Fastener kits 54 609 4 4 Hex Bolt 1 4 20 3 4 GR 5 ZINC 90 204 94 112 Serrated...
Страница 4: ...ion of the cab box raiser to avoid any items underneath Mark the location of the 4 holes Drill and insert the 4 Plusnuts See Section 2 3 on using the Plusnut tool TOOLS q Cordless drill q 1 2 Drill Bi...
Страница 5: ...Socket q 9 16 Wrench STEP 1 Assemble the 6490 Plusnut tool with the hardware needed Plusnut and the 9 16 wrench as shown FORWARD REVERSE STEP 2 Secure the Plusnut to the hole by turning the bolt forwa...
Страница 6: ...us at 1 800 565 5321 5047 Installation Guide REV A1 Page 6 You have successfully installed your 5047 Raised Base Thank you for doing business with us For any feedback or suggestions you may have pleas...