background image

 

Installation: 

 

1. 

Screw in the fixing stud (D) into the base of the tap (A). 

 
2. 

Place the base plinth (B) then upper seal (C) onto the base of the tap (A). 

 

3. 

Screw the hot & cold water flexi pipes (M & N) into the base of the tap. 

 

4. 

Place the mixertap (A) onto the sink or worktop; pass the flexi pipes (M & N), nylon hose (J) and fixing stud (D) through the taphole. With the tap in 
place check that the flexi pipes (M &N) meet the hot and cold water feeds. If further adjustment to the plumbing is required do this now.  

 

5. 

Pass the rubber and then metal horseshoe (F & G) over the fixing stud (D) and around the tail pipes (M & N) and nylon hose (J). Position the tap 
central to the tap hole the tighten fixing nut ((H) onto the fixing stud (D). If fitting the tap to a stainless steel sinks the white triangular stabilizer (E) 
can be placed where shown to help to stabilize the weight of the tap. 

 

6. 

Place the fibre washer (I) in the end of nylon hose (J) and  then tighten the nylon hose (J) onto the fixing nut (H). Note ensure the hose is not 
twisted and has free space in the cabinet to move. 

 

7. 

Fasten the hose weight (K) around the lowest point of the nylon hose (J) using hose weight screws (L). 

 

8. 

Connect the flexi tails pipe (M & N) to the water supply using ½” BSPx15mm compression fittings. 

 

Note: the hose weight is designed to pull the hose straight after use; it will not pull the spout head automatically back into the spout and may have to be returned by hand. 

 

Key: 

Description: 

Qty 

 

Tap body 

 

Base plinth 

 

Upper seal 

 

Hollow fixing stud 

 

White triangular stabilizer  
(for stainless steel sinks only) 

 

Rubber horseshoe 

 

Metal horseshoe 

 

Fixing nut 

 

Fibre washer 

 

Nylon Hose 

 

Hose weight 

 

Hose weight screws 

 

Hot flexi tail 

 

Cold flexi tail 

 

 
After installation: 

 

Once you have visually checked the installation of the new tap and 
all connections, ensure that all other fittings are closed except the 
new tap which should be left open.  
 
Turn on your water heating system and ensure that your mains 
stopcock is open. Reconnect both the hot and cold water supplies 
to this fitting. 
 
Check the function of flow and function of hot, cold and mixed 
water. 
 
Turn off the tap and check carefully for any leaks around all 
connections on the fitting and adjoining plumbing. 
If possible return to the installation after a longer period to double 
check for slower leaks. If pressure testing equipment is available 
check the installation to the maximum recommended pressure. 
 
Clean the tap to remove any marks created during installation as 
instructed then place a bag over the product to protect the tap until 
it is ready for use. 
 
The installation should be periodically checked for damage, if the 
property is left unattended for a prolonged period we recommend 
isolating water supplies. 

 

 

 

 

 

Отзывы: